FIR05-00536 INSP-Sprinkler Rough-in7/6/20077/9/20077/10/2007 7:39:57 AMAPASS
Underground fill line to the secondary storage tank is ok to cover.
BLD07-00097 FIRE-Final Inspection7/9/20077/9/20077/9/2007 3:15:32 PMPPASS
Life safety passed
MIS07-00144 FIR-Final7/6/20077/9/20077/9/2007 3:14:55 PMAPART
A temporary occupancy was given until the painted sprinkler pendants have been changed out and the fire extinguisher gets tagged.
FIR07-00204 INSP-Sprinkler Rough-in7/5/20077/9/20077/9/2007 12:40:45 PMAPASS
The rough-in for the first floor is ok except for the sprinkler upright in the northwest corner, as marked on the plans, that is overspaced by being 7'10" off of the wall. Also there is no separation of nonsprinklered areas from the sprinklered areas as per NFPA 13 Chapter 8. I spoke to the general contractor Nick about this. It appears that he is going to install the separation instead of installing additional upright sprinklers. This will ave to be verified at the final.
BLD07-01475 FIRE-Conference7/6/20077/9/20077/9/2007 12:24:36 PMADONE
I went over life safety requiements with dave which included the placement of exit signs and emergency lights.