FIR08-00373
| INSP-Sprinkler Rough-in/Hydro | 7/9/2008 | 7/9/2008 | 7/9/2008 2:38:18 PM | P | PART |
|
|
Changes made per last inspection. OK to cover. KR
|
FIR08-00243
| INSP-Sprinkler Rough-in/Hydro | 7/9/2008 | 7/9/2008 | 7/9/2008 11:01:47 AM | A | PASS |
|
|
Overhead hydro test passed. Rough-in passed.
|
BLD08-01301
| FIRE-Final Inspection | 7/8/2008 | 7/9/2008 | 7/9/2008 10:59:46 AM | A | CANC |
|
|
Per the general contractor this project is not ready for a final inspection
|
BLD07-00044
| FIRE-Final Inspection | 7/8/2008 | 7/9/2008 | 7/9/2008 7:40:30 AM | A | PASS |
|
|
Life safety passed
|
FIR08-00411
| INSP-Sprinkler Rough-in/Hydro | 7/8/2008 | 7/9/2008 | 7/8/2008 4:20:35 PM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 7/8/2008 at 4:17:50 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 8 2008 4:20PM.
|