BLD09-00173
| BLD-Conference | 7/9/2009 | 7/9/2009 | 7/9/2009 5:36:12 PM | P | DONE |
|
|
Pat Phone #: ###-####
|
BLD08-02568
| BLD-Conference | 7/9/2009 | 7/9/2009 | 7/9/2009 5:35:32 PM | P | PASS |
|
|
shaun Phone #: ###-#### Verified hold down at W. wall ....Electrical room......OK to cover.
|
BLD07-02083
| BLD-Energy code compliance | 7/9/2009 | 7/9/2009 | 7/9/2009 5:34:07 PM | P | PASS |
|
|
Rockwool insulation in mechanical room Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD09-00461
| BLD-Footing | 7/9/2009 | 7/9/2009 | 7/9/2009 2:11:15 PM | P | PART |
|
|
brandon Phone #: ###-#### Int. foot ....MTI on site.
|
BLD08-02023
| BLD-Conference | 7/8/2009 | 7/9/2009 | 7/9/2009 12:41:28 PM | A | CANC |
|
|
RE-Sched....
|
ESC09-00097
| Site Final | 6/24/2009 | 7/9/2009 | 7/9/2009 11:31:07 AM | A | PASS |
|
|
Check to see if completed.
|
ESC09-00097
| Site Final | 7/9/2009 | 7/9/2009 | 7/9/2009 11:30:43 AM | P | PASS |
|
|
Check to see if completed.........OK
|
BLD09-01118
| BLD-Footing | 7/8/2009 | 7/9/2009 | 7/9/2009 11:29:57 AM | A | PASS |
|
|
Katie-As early as possible Phone #: ###-####
|
ESC09-00310
| Site Preparation | 7/8/2009 | 7/9/2009 | 7/9/2009 10:52:15 AM | A | NR |
|
|
Dennis phone.....Re-Sched......
|