FIR09-00164
| INSP-Sprinkler Rough-in/Hydro | 7/8/2009 | 7/9/2009 | 7/10/2009 8:13:49 AM | A | PART |
|
|
See red-line annotations on plan set for classroom wing first floor north side inspected today. Noted two overspaced heads at the office area, rough-in at one classroom does not match approved design, bandroom is incomplete as upright protection above the ceiling remains to be added. Hydrostatic test for the 1st floor classroom wet system passed.
|
FIR09-00033
| INSP-Sprinkler Rough-in | 7/8/2009 | 7/9/2009 | 7/10/2009 8:07:42 AM | A | PART |
|
|
Rough-in inspections for systems #2 and #3 completed acceptable.
|
BLD09-00703
| FIRE-Final Inspection | 7/9/2009 | 7/9/2009 | 7/10/2009 8:05:28 AM | P | FAIL |
|
|
Three items on the correction notice remain to be completed including hardware at the second storefront exit, signage at the back exit, remove the curtain from the path of egress.
|
BLD08-01257
| FIRE-Final Inspection | 7/8/2009 | 7/9/2009 | 7/9/2009 12:50:03 PM | A | PASS |
|
|
Fire life safety inspection completed acceptable.
|
FIR09-00053
| FIR-Aging Inspection | 7/9/2009 | 7/9/2009 | 7/9/2009 12:48:30 PM | | DONE |
|
|
Work in progress
|
BLD09-01039
| FIRE-Final Inspection | 7/8/2009 | 7/9/2009 | 7/9/2009 12:47:36 PM | A | FAIL |
|
|
Correction items include repair of existing fire sprinkler system deficiencies at locations lacking coverage, provide current annual inspections for the exisitng fire alarm and sprinkler systems, repair door hardware at one area first floor, provide current certification for fire extinguishers and post throughout as discussed. See list of general requirements for items noted.
|
BLD08-01767
| FIRE-Final Inspection | 7/7/2009 | 7/9/2009 | 7/9/2009 12:42:13 PM | A | PASS |
|
|
Fire life safety is satisfactory pending the two fire extinguishers are posted as discussed at locations indicated per approved plans prior to structural final inspection.
|
FIR08-00737
| INSP-Final Inspection | 7/9/2009 | 7/9/2009 | 7/9/2009 12:39:39 PM | A | PASS |
|
|
Correction items verified for completion, fire sprinkler permit finaled.
|