FIR08-00830
| INSP-Sprinkler Rough-in/Hydro | 7/9/2009 | 7/9/2009 | 7/9/2009 3:58:21 PM | P | PASS |
|
|
The sprinkler piping in the mechanical room/riser room is ok to cover.
|
BLD09-01022
| FIRE-Final Inspection | 7/8/2009 | 7/9/2009 | 7/9/2009 3:02:15 PM | A | FAIL |
|
|
Per the previously issued plans all life safety items are passed including testing of the mag lock on the main exit door. Final approval can not be given until the plan modifications have been issued and inspected.
|
FIR09-00346
| INSP-Sprinkler Rough-in | 7/9/2009 | 7/9/2009 | 7/9/2009 2:58:20 PM | P | PASS |
|
|
The sprinkler piping, as marked on the plans with todays date, can be covered.
|
FIR09-00345
| INSP-Sprinkler Rough-in | 7/9/2009 | 7/9/2009 | 7/9/2009 2:57:51 PM | P | PASS |
|
|
The sprinkler piping, as marked on the plans with todays date, can be covered.
|
BLD09-00612
| FIRE-Final Inspection | 7/8/2009 | 7/9/2009 | 7/9/2009 10:39:17 AM | A | PASS |
|
|
Life safety passed.
|
FIR09-00373
| INSP-Final Inspection | 7/8/2009 | 7/9/2009 | 7/9/2009 10:02:07 AM | A | PASS |
|
|
permit finaled. One additional pendant needed to be plugged. I made two trips to the project and verified that the work was done.
|
FIR09-00228
| FIR-Aging Inspection | 7/9/2009 | 7/9/2009 | 7/9/2009 8:31:01 AM | | NR |
|
|
work is in progress
|