Inspections for the day of: Friday, July 9, 2010.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00516 BMP Violation7/8/20107/9/20107/9/2010 3:25:01 PMAPASS
ESC10-00520 Site Preparation7/9/20107/9/20107/9/2010 3:24:53 PM NR
ESC05-01229 Aging Inspection7/9/20107/9/20107/9/2010 2:32:33 PM DONE
ESC05-01226 Aging Inspection7/9/20107/9/20107/9/2010 2:32:27 PM DONE
ESC05-01231 Aging Inspection7/9/20107/9/20107/9/2010 2:32:22 PM DONE
ESC05-01231 DOC - Permit Finaled7/9/20107/9/20107/9/2010 2:32:13 PMPPASS
ESC05-01226 DOC - Permit Finaled7/9/20107/9/20107/9/2010 2:32:06 PMPPASS
ESC05-01229 DOC - Permit Finaled7/9/20107/9/20107/9/2010 2:31:58 PMPPASS
ESC10-00422 General Inspection7/8/20107/9/20107/9/2010 2:31:47 PMPCANC
ESC10-00010 General Inspection ESC7/9/20107/9/20107/9/2010 2:31:40 PM PART
Need to stay up on sweeping up at all accesses of the project area from the subbase to the paved streets.
ESC09-00583 Site Final7/6/20107/9/20107/9/2010 1:58:33 PMAPASS
ESC09-00583 DOC - Permit Finaled7/9/20107/9/20107/9/2010 1:58:05 PMPPASS
ESC10-00474 Site Preparation7/9/20107/9/20107/9/2010 10:43:15 AMAPART
Must provide a washout prior to any non storm wash clean out occur.
ESC10-00432 BMP Violation7/8/20107/9/20107/9/2010 10:41:26 AMADONE
Went over the installation of of pocketed silt fence and how it is required to be installed in the future.
ESC10-00185 BMP Violation7/8/20107/9/20107/9/2010 10:36:02 AMADONE
went over with the issue of what occured with the dewatering and told them options of how they could have achieved compliance.