FIR13-00259
| INSP-Final Inspection | 7/9/2013 | 7/9/2013 | 7/10/2013 5:16:00 PM | P | PASS |
|
|
|
FIR13-00253
| INSP-Sprinkler Rough-in | 7/9/2013 | 7/9/2013 | 7/9/2013 5:12:03 PM | P | PART |
|
|
For relocated pendents at the adjacent soffit.
|
FIR13-00269
| INSP-Sprinkler Rough-in | 7/9/2013 | 7/9/2013 | 7/9/2013 5:11:01 PM | P | PART |
|
|
Inspection for coverage at the new floral cooler completed- need to seal gap at DP through cooler panel, replace with matched response type the sprinkler adjacent east of the new wall as discussed.
|
FIR13-00268
| INSP-Conference | 7/9/2013 | 7/9/2013 | 7/9/2013 5:07:29 PM | P | DONE |
|
|
Regarding project completion to date
|
FIR13-00254
| INSP-Sprinkler Rough-in | 7/8/2013 | 7/9/2013 | 7/9/2013 5:06:31 PM | A | PART |
|
|
Okay to cover scope of work at the 3rd floor remodel area including field changes.
|
BLD13-01642
| FIRE-Conference | 7/8/2013 | 7/9/2013 | 7/9/2013 5:05:21 PM | A | DONE |
|
|
On site conference with tenant rep. regarding conditions for occupancy approvals including door hardware, signage, fire extinguisher, review comments, etc.
|
FIR13-00057
| INSP-Final Inspection | 7/8/2013 | 7/9/2013 | 7/9/2013 8:54:39 AM | A | CANC |
|
|
Final inspection. Please call Rick at above number prior to arrival Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|