FIR13-00234
| INSP-Sprinkler Rough-in | 7/9/2013 | 7/9/2013 | 7/9/2013 3:39:49 PM | P | PASS |
|
|
Piping can be covered in the lay-in tile area.
|
FIR13-00280
| INSP-Conference | 7/8/2013 | 7/9/2013 | 7/9/2013 3:25:48 PM | A | DONE |
|
|
Provide interconnection of the smoke detector with the fire alarm system per IFC 907.4, provide annual inspection report for the fire alarm system and provide dedicated circuit for the facp and the AES panel
|
FIR12-00663
| FIR-Aging Inspection | 7/9/2013 | 7/9/2013 | 7/9/2013 2:50:41 PM | | PASS |
|
|
|
FIR12-00538
| FIR-Aging Inspection | 7/9/2013 | 7/9/2013 | 7/9/2013 2:38:54 PM | | DONE |
|
|
work is in progress
|
BLD13-01514
| FIRE-Final Inspection | 7/8/2013 | 7/9/2013 | 7/9/2013 2:34:13 PM | P | FAIL |
|
|
With the removal of the wall two sprinkler heads are now too close to one another. When this is addressed the life safety can be finaled.
|
BLD13-00126
| FIRE-Final Inspection | 7/8/2013 | 7/9/2013 | 7/9/2013 1:57:07 PM | P | PASS |
|
|
life safety passed
|
FIR13-00281
| INSP-Sprinkler Rough-in | 7/8/2013 | 7/9/2013 | 7/9/2013 1:00:30 PM | A | PASS |
|
|
sprinkler piping is ok to cover.
|
FIR12-00583
| INSP-Supply line flush | 7/8/2013 | 7/9/2013 | 7/9/2013 10:31:41 AM | A | PASS |
|
|
Performed six underground flushes for the remaining buildings. All six passed.
|