BLD14-00455
| FIRE-Final Inspection | 7/8/2014 | 7/9/2014 | 7/9/2014 4:01:51 PM | A | PASS |
|
|
building and spray booth pass. Spray booth was inspected for all iFC related requirements. Electrical and mechanical inspections for spray booth completed by related trades.
|
FIR14-00369
| INSP-Final Inspection | 7/8/2014 | 7/9/2014 | 7/9/2014 11:55:16 AM | A | PASS |
|
|
sprinkler system tested and passed
|
FIR14-00403
| INSP-Final Inspection | 7/8/2014 | 7/9/2014 | 7/9/2014 11:52:46 AM | A | PASS |
|
|
system tied into paint booth.
|
FIR14-00323
| INSP-Final Inspection | 7/8/2014 | 7/9/2014 | 7/9/2014 11:52:09 AM | A | PASS |
|
|
new pannel tested and passed.
|