FIR14-00269
| INSP-Sprinkler Rough-in | 7/8/2014 | 7/9/2014 | 7/10/2014 12:30:26 PM | A | PART |
|
|
Okay to cover upright protection at the south end of the central skylight past the fire wall. *Note- existing upright sprinklers at the west corridor and adjacent classrooms in need of adjustment to maintain deflectors parallel to the ceiling in accordance with NFPA 13 2013 sec. 8.1(3) and 8.6.4.2.1.
|
FIR14-00386
| INSP-Sprinkler Rough-in | 7/9/2014 | 7/9/2014 | 7/9/2014 4:41:27 PM | P | PART |
|
|
UG fire supply line okayed for bury. Overhead rough-in inspection completed- *Need to meet min. spacing at pendent heads in three rooms affecting 8 heads total. Tenting is not installed at this time.
|
BLD14-01594
| FIRE-Final Inspection | 7/9/2014 | 7/9/2014 | 7/9/2014 4:37:25 PM | P | PART |
|
|
Fire life safety inspection completed satisfactory. Final pending field ceiling tile throughout and project finishes.
|
FIR13-00599
| INSP-Supply line flush | 7/8/2014 | 7/9/2014 | 7/9/2014 4:35:35 PM | P | PART |
|
|
Completed UG fire supply line flush for buildings 1 and 2.
|
FIR13-00599
| INSP-Sprinkler Rough-in/Hydro | 7/8/2014 | 7/9/2014 | 7/9/2014 4:33:57 PM | A | PART |
|
|
UG fire supply lines passed hydrostatic testing.
|
FIR14-00327
| INSP-Sprinkler Rough-in | 7/8/2014 | 7/9/2014 | 7/9/2014 4:33:03 PM | A | PART |
|
|
Okay to cover fire sprinkler work at grid ceilings as marked and dated on approved plans. Coverage at two offices adjusted while on site.
|
BLD14-01773
| FIRE-Final Inspection | 7/8/2014 | 7/9/2014 | 7/9/2014 12:45:25 PM | A | FAIL |
|
|
Provide approved door hardware at the main entry/exit per discussion, post and provide current certification for the fire extinguisher. Refer to permit documents items number 2 and 4 for details.
|