BLD14-01480
| BLD-Footing | 7/9/2014 | 7/9/2014 | 7/9/2014 4:43:28 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD14-01481
| BLD-Footing | 7/9/2014 | 7/9/2014 | 7/9/2014 4:43:17 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD14-00207
| BLD-Footing | 7/9/2014 | 7/9/2014 | 7/9/2014 4:15:01 PM | P | PASS |
|
|
Dane-late pm please Phone #: ###-####
|
ESC14-00065
| Site Preparation | 7/9/2014 | 7/9/2014 | 7/9/2014 4:14:39 PM | P | PASS |
|
|
|
BLD14-01809
| BLD-Final | 7/8/2014 | 7/9/2014 | 7/9/2014 4:00:22 PM | P | PART |
|
|
Herb Phone #: ###-####. ok for temp occ. Needs to provide ADA compliant sales and service couter or provide letter to building official approving an alternate method of a seperate sales and service counter nearby.
|
BLD14-01482
| BLD-Footing | 7/9/2014 | 7/9/2014 | 7/9/2014 3:15:07 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD14-01483
| BLD-Footing | 7/9/2014 | 7/9/2014 | 7/9/2014 3:14:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD14-01479
| BLD-Footing | 7/9/2014 | 7/9/2014 | 7/9/2014 3:14:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Larkin
|
BLD13-03532
| BLD-Framing/Rough-in | 7/8/2014 | 7/9/2014 | 7/9/2014 2:58:15 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark. Provide additional studs on either side of 2plyin garage to providebearing at end of wall, Also repair bottom plate at this location. Complete all fireblocking Provide 2 layers of 5/8 type x rock at soffits. Install baffels and rulers in attic. Steps in garge are non code compliant.
|
BLD13-03533
| BLD-Framing/Rough-in | 7/8/2014 | 7/9/2014 | 7/9/2014 2:57:36 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark. Provide additional studs on either side of 2plyin garage to providebearing at end of wall, Also repair bottom plate at this location. Complete all fireblocking Provide 2 layers of 5/8 type x rock at soffits. Install baffels and rulers in attic. Steps in garge are non code compliant.
|
BLD13-03534
| BLD-Framing/Rough-in | 7/8/2014 | 7/9/2014 | 7/9/2014 2:56:56 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark. Provide additional studs on either side of 2plyin garage to providebearing at end of wall, Also repair bottom plate at this location. Complete all fireblocking Provide 2 layers of 5/8 type x rock at soffits. Install baffels and rulers in attic. Steps in garge are non code compliant.
|
ESC13-01316
| General Inspection | 7/9/2014 | 7/9/2014 | 7/9/2014 2:53:20 PM | P | PART |
|
|
Needs to sweep all hard surfaces of silts and service BMP's. Correction notice posted.
|
ESC13-01317
| General Inspection | 7/9/2014 | 7/9/2014 | 7/9/2014 2:52:58 PM | P | PART |
|
|
Needs to sweep all hard surfaces of silts and service BMP's. Correction notice posted.
|
ESC13-01318
| General Inspection | 7/9/2014 | 7/9/2014 | 7/9/2014 2:52:37 PM | P | PART |
|
|
Needs to sweep all hard surfaces of silts and service BMP's. Correction notice posted.
|
BLD13-03532
| BLD-Wall Bracing | 7/9/2014 | 7/9/2014 | 7/9/2014 2:49:14 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark. Several areas were sheating is not attached. Correction notice posted.
|
BLD13-03533
| BLD-Wall Bracing | 7/9/2014 | 7/9/2014 | 7/9/2014 2:48:34 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark. Several areas were sheating is not attached. Correction notice posted.
|
BLD13-03534
| BLD-Wall Bracing | 7/9/2014 | 7/9/2014 | 7/9/2014 2:48:08 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Stark. Several areas were sheating is not attached. Correction notice posted.
|
BLD13-03538
| BLD-Wall cover | 7/9/2014 | 7/9/2014 | 7/9/2014 2:46:49 PM | P | PASS |
|
|
firewall construction Phone #: ###-#### Inspection requested via web by James Larkin. 3rd floor firewall ok.
|
BLD13-03539
| BLD-Wall cover | 7/9/2014 | 7/9/2014 | 7/9/2014 2:46:20 PM | P | PASS |
|
|
firewall construction Phone #: ###-#### Inspection requested via web by James Larkin. 3rd floor firewall ok.
|
BLD13-03536
| BLD-Wall cover | 7/9/2014 | 7/9/2014 | 7/9/2014 11:42:47 AM | A | PASS |
|
|
firewall construction Phone #: ###-#### Inspection requested via web by James Larkin3rd floor ok.
|
BLD13-03537
| BLD-Wall cover | 7/9/2014 | 7/9/2014 | 7/9/2014 11:42:24 AM | A | PASS |
|
|
firewall construction Phone #: ###-#### Inspection requested via web by James Larkin. #rd floor ok.
|
BLD14-01418
| BLD-Final | 7/8/2014 | 7/9/2014 | 7/9/2014 10:00:25 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
BLD14-01418
| DOC - Permit Finaled | 7/9/2014 | 7/9/2014 | 7/9/2014 10:00:14 AM | P | PASS |
|
|
|
BLD14-00322
| BLD-Wall cover | 7/9/2014 | 7/9/2014 | 7/9/2014 9:51:03 AM | A | PASS |
|
|
First layer of drywall for fire rated ceiling for nailing. Mike can you make it later in the morning inspection like between 11 and 12....that would be great. Phone #: ###-#### Inspection requested via web by robert campbell
|
BLD14-00205
| BLD-Energy code compliance | 7/8/2014 | 7/9/2014 | 7/9/2014 9:22:22 AM | A | PASS |
|
|
Ashley-foundation energy Phone #: ###-####. rigid insulation on stemwall under slab on grade.
|
BLD14-00206
| BLD-Footing | 7/9/2014 | 7/9/2014 | 7/9/2014 9:17:56 AM | P | CANC |
|
|
late afternoon - Dane Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|
BLD13-01075
| BLD-Final | 7/8/2014 | 7/9/2014 | 7/9/2014 9:08:42 AM | A | PASS |
|
|
Joe Phone #: ###-####. ok for perm occ.
|
GCB14-00075
| GCB-Fndatn/slab ins/fld vent | 7/8/2014 | 7/9/2014 | 7/9/2014 8:45:12 AM | A | PASS |
|
|
|