FIR18-00411
| INSP-Sprinkler Rough-in/Hydro | 7/9/2018 | 7/9/2018 | 7/10/2018 9:43:59 AM | P | PART |
|
|
The preliminary hydro test for the 1st, 2nd and 3rd floors passed. Another overhead hydro will be required when the drops have been cut.
|
FIR17-00596
| INSP-Sprinkler Rough-in | 7/6/2018 | 7/9/2018 | 7/9/2018 11:28:13 AM | A | PASS |
|
|
See the city approved plans for room locations where overhead piping can be covered.
|