Inspections for the day of: Tuesday, July 9, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-02518 Conference7/8/20197/9/20197/9/2019 2:52:41 PMPDONE
To review the project and the cities position on this old building! Please call me with a approximate time for access and coordination! Phone #: ###-#### Inspection requested via web by Steven Meredith Discussed removal of fire damage wire in upstairs storage area.
ELE18-01606 Electrical Rough-In7/9/20197/9/20197/9/2019 2:19:13 PMPPASS
Building B
4th Floor East Corridor Drop Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover area listed.
ELE19-02497 Electrical Rough-In7/9/20197/9/20197/9/2019 12:42:33 PMPPASS
Ceiling cover in front of space. Von is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Ok cover front half ceilings. They will be sheet rocked. 2nd have ceiling will be dropped celing.
ELE19-00667 Final7/9/20197/9/20197/9/2019 12:41:22 PMPPASS
Phone #: ###-#### Inspection requested via web by Buster Bowen Ok final.
ELE19-02287 Final7/9/20197/9/20197/9/2019 12:29:37 PMPPASS
CONTACT IS JAMES Phone #: ###-#### Inspection requested via web by Lori Stout Ok final.
ELE19-02520 Electrical Rough-In7/9/20197/9/20197/9/2019 12:03:16 PMPPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover all office walls on 1st floor. 2 conference rooms have required amount of floor boxes installed.
ELE19-01927 Electrical Rough-In7/8/20197/9/20197/9/2019 11:33:47 AMAPASS
Marcelo Phone #: ###-#### Ok cover perimeter ceiling in Teller area and conf rm. Conf rm has floor box.
ELE19-01590 Electrical Rough-In7/9/20197/9/20197/9/2019 11:21:03 AMPPASS
Floor heat in master bath Phone #: ###-#### Inspection requested via web by Emmet Bushman Ok cover flr heat mstr.
ELE19-02519 Final7/9/20197/9/20197/9/2019 10:32:25 AMPPASS
Ok final. Just fixed meter base. No other work to be done.
ELE19-02519 Permanent Service7/9/20197/9/20197/9/2019 10:31:47 AMPPASS
Meter inspection for power to be restored. IPCO asked that right load lug be repaired in order to restore. Lug has been repaired. Phone #: ###-#### Inspection requested via web by Steven Ragan p/s u/g rec ok
ELE19-01464 Final7/8/20197/9/20197/9/2019 10:06:41 AMAPASS
changed out outlets to TR Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok final. Corrections made.
ELE19-02332 Electrical Rough-In7/8/20197/9/20197/9/2019 9:43:16 AMAPASS
Ready for underground inspection on pool. Phone #: ###-#### Inspection requested via web by Kelly Felin Ok cover 4 conduits E side, and boots for ladder.
ELE19-02516 Final7/8/20197/9/20197/9/2019 9:13:25 AMAPASS
Please call Brodie with any questions Phone #: ###-#### Inspection requested via web by William Salts Ok final. 35a brkr feeding disc with 25a fuses. Existng service recept in place.
ELE17-02381 ELE-Aging Inspection7/9/20197/9/20197/9/2019 5:26:48 AM DONE
Please call with progress on job or schedule a final inspection.
ELE17-00919 ELE-Aging Inspection7/9/20197/9/20197/9/2019 5:24:57 AM DONE
Please schedule a final inspection.
ELE17-00918 ELE-Aging Inspection7/9/20197/9/20197/9/2019 5:24:15 AM DONE
Please schedule a final inspection.