ELE19-02518
| Conference | 7/8/2019 | 7/9/2019 | 7/9/2019 2:52:41 PM | P | DONE |
|
|
To review the project and the cities position on this old building! Please call me with a approximate time for access and coordination! Phone #: ###-#### Inspection requested via web by Steven Meredith Discussed removal of fire damage wire in upstairs storage area.
|
ELE18-01606
| Electrical Rough-In | 7/9/2019 | 7/9/2019 | 7/9/2019 2:19:13 PM | P | PASS |
|
|
Building B 4th Floor East Corridor Drop Phone #: ###-#### Inspection requested via web by Stephanie Huston Ok cover area listed.
|
ELE19-02497
| Electrical Rough-In | 7/9/2019 | 7/9/2019 | 7/9/2019 12:42:33 PM | P | PASS |
|
|
Ceiling cover in front of space. Von is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Ok cover front half ceilings. They will be sheet rocked. 2nd have ceiling will be dropped celing.
|
ELE19-00667
| Final | 7/9/2019 | 7/9/2019 | 7/9/2019 12:41:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Buster Bowen Ok final.
|
ELE19-02287
| Final | 7/9/2019 | 7/9/2019 | 7/9/2019 12:29:37 PM | P | PASS |
|
|
CONTACT IS JAMES Phone #: ###-#### Inspection requested via web by Lori Stout Ok final.
|
ELE19-02520
| Electrical Rough-In | 7/9/2019 | 7/9/2019 | 7/9/2019 12:03:16 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover all office walls on 1st floor. 2 conference rooms have required amount of floor boxes installed.
|
ELE19-01927
| Electrical Rough-In | 7/8/2019 | 7/9/2019 | 7/9/2019 11:33:47 AM | A | PASS |
|
|
Marcelo Phone #: ###-#### Ok cover perimeter ceiling in Teller area and conf rm. Conf rm has floor box.
|
ELE19-01590
| Electrical Rough-In | 7/9/2019 | 7/9/2019 | 7/9/2019 11:21:03 AM | P | PASS |
|
|
Floor heat in master bath Phone #: ###-#### Inspection requested via web by Emmet Bushman Ok cover flr heat mstr.
|
ELE19-02519
| Final | 7/9/2019 | 7/9/2019 | 7/9/2019 10:32:25 AM | P | PASS |
|
|
Ok final. Just fixed meter base. No other work to be done.
|
ELE19-02519
| Permanent Service | 7/9/2019 | 7/9/2019 | 7/9/2019 10:31:47 AM | P | PASS |
|
|
Meter inspection for power to be restored. IPCO asked that right load lug be repaired in order to restore. Lug has been repaired. Phone #: ###-#### Inspection requested via web by Steven Ragan p/s u/g rec ok
|
ELE19-01464
| Final | 7/8/2019 | 7/9/2019 | 7/9/2019 10:06:41 AM | A | PASS |
|
|
changed out outlets to TR Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok final. Corrections made.
|
ELE19-02332
| Electrical Rough-In | 7/8/2019 | 7/9/2019 | 7/9/2019 9:43:16 AM | A | PASS |
|
|
Ready for underground inspection on pool. Phone #: ###-#### Inspection requested via web by Kelly Felin Ok cover 4 conduits E side, and boots for ladder.
|
ELE19-02516
| Final | 7/8/2019 | 7/9/2019 | 7/9/2019 9:13:25 AM | A | PASS |
|
|
Please call Brodie with any questions Phone #: ###-#### Inspection requested via web by William Salts Ok final. 35a brkr feeding disc with 25a fuses. Existng service recept in place.
|
ELE17-02381
| ELE-Aging Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 5:26:48 AM | | DONE |
|
|
Please call with progress on job or schedule a final inspection.
|
ELE17-00919
| ELE-Aging Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 5:24:57 AM | | DONE |
|
|
Please schedule a final inspection.
|
ELE17-00918
| ELE-Aging Inspection | 7/9/2019 | 7/9/2019 | 7/9/2019 5:24:15 AM | | DONE |
|
|
Please schedule a final inspection.
|