ELE19-01756
| Final | 7/8/2019 | 7/9/2019 | 7/9/2019 2:19:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot... corrections made...ok to final
|
ELE19-02524
| Rough-In Permanent Service | 7/9/2019 | 7/9/2019 | 7/9/2019 1:59:48 PM | P | PASS |
|
|
panel change and circuit for tile heat.. p/s u/g reconnect ok
|
ELE19-02465
| Electrical Rough-In | 7/9/2019 | 7/9/2019 | 7/9/2019 1:17:27 PM | P | PASS |
|
|
late afternoon if possible, thank you. Phone #: ###-#### Inspection requested via web by Taras Shulga...rough ok to cover...new kitchen layout, hall bath, mst bath with heated tile 1 outlet needs added by final right of fireplace discussed future inspection of tile heat install
|
ELE19-02489
| Electrical Rough-In | 7/9/2019 | 7/9/2019 | 7/9/2019 12:14:28 PM | P | PASS |
|
|
Inspect floor boxes for sunglass hut kiosk so they can pour concrete in small thin trench. Phone #: ###-#### Inspection requested via web by Kendra Lanham...ok to cover
|
ELE19-02502
| Rough-In Permanent Service | 7/8/2019 | 7/9/2019 | 7/9/2019 10:32:08 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson... rough ok to cover p/s u/g new ok
|
ELE19-02517
| Temporary Service | 7/8/2019 | 7/9/2019 | 7/9/2019 9:48:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Charles Davis... t/s u/g new ok
|
ELE17-03357
| Final | 7/6/2019 | 7/9/2019 | 7/9/2019 9:06:56 AM | A | PASS |
|
|
Mark Verbon, Homeowner, ###-####. Back yard outlets for fountain and general purpose. Thanks! Phone #: ###-#### Inspection requested via web by Adam Staigle..ok to final
|
ELE19-02414
| Electrical Rough-In | 7/8/2019 | 7/9/2019 | 7/9/2019 8:47:53 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting...UL listed material verified...access at final needed...discussed clearance in front of disconnect and controls
|
ELE19-01295
| Final | 7/8/2019 | 7/9/2019 | 7/9/2019 8:13:51 AM | A | PASS |
|
|
access: 4141 Phone #: ###-#### Inspection requested via web by David Nelson... corrections made...ok to final
|