BLD1053872
| INSP - Carpentry | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | PASS |
|
|
SHEAR STRAPS AT 3RD LEVEL.
|
BLD1053890
| INSP - Carpentry | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | PASS |
|
|
SHEAR STRAPS AT 3RD LEVEL.
|
BLD1053898
| INSP - Carpentry | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | PASS |
|
|
SHEAR STRAPS AT 3RD LEVEL.
|
BLD95-00219
| INSP - Conference | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | PASS |
|
|
ON OCCUPANCY SEPARATION REQUIREMENTS AND PHLENUM REQUIREMENTS. OCC. SEP. TO BE CONTINUOS TO ROOF SHEATHING AND NO COMBUSTIBLES ALLOWED IN PLENUM.
|
BLD95-00201
| INSP - Framing/ Rough-in | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | P | PASS |
|
|
OK FOR COVER WHEN ROUGH-INS APPROVED. CN ISSUED.
|