MEC3047799
| INSP - Final | 7/31/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | FAIL |
|
|
need: protection post, and will check in p.m. 20 min
|
MEC95-00110
| INSP - Final | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | FAIL |
|
|
need: range hood was not vented, can was laying inside cabinet, fix hole around dryer vent. 20 min
|
MEC95-00340
| INSP - Gas log/ Fireplace | 7/27/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | PASS |
|
|
f/p were sheetrocked over before inspection, pulled a permit on final. 20 min
|
MEC95-00340
| INSP - Gas log/ Fireplace | 7/27/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | |
|
|
|
MEC3046579
| INSP - Final | 7/31/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | PASS |
|
|
corrections were made final ok. 20 min
|
MEC95-00385
| INSP - Gas pressure test | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | PASS |
|
|
26196/10 MIN
|
MEC95-00385
| INSP - Framing/ Rough-in | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | A | PASS |
|
|
10 MIN
|
MEC3047544
| INSP - Final | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | P | PASS |
|
|
range hoods were fixed and dryer tags where installed. 25 min
|
MEC3047799
| INSP - Final | 7/31/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | P | PASS |
|
|
protection post was installed final.. 20 min
|
MEC3044072
| INSP - Final | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | P | PASS |
|
|
final was ok, 20 min
|
MEC95-00364
| INSP - Framing/ Rough-in | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | P | PASS |
|
|
corrections were made and approved. 20 min
|
MEC95-00382
| INSP - Gas log/ Fireplace | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | P | PASS |
|
|
f/p ok no gas to f/p yet. 20 min
|
MEC95-00383
| INSP - Framing/ Rough-in | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | P | PASS |
|
|
r/i was for range exhaust duct in wall, will run rest of duct later. 20 min
|
MEC95-00384
| INSP - Framing/ Rough-in | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | P | PASS |
|
|
dryer vent lengths to be recorded by builder, and range hood vents were ok. 20 min
|
MEC95-00384
| INSP - Conference | 8/1/1995 | 8/1/1995 | 8/1/1995 12:00:00 AM | P | PASS |
|
|
talked with jeff about dryer lengths and tags to be supplied by builder. 20 min
|