Inspections for the day of: Thursday, August 1, 1996.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM96-00647 INSP - Final8/1/19968/1/19968/2/1996 12:00:00 AMPPASS
08/01/96 330 -
PLM96-01742 INSP - Plumbing Rough-in8/1/19968/1/19968/2/1996 12:00:00 AMPFAIL
08/01/96 330 - antirotation on master w.h., remove water from exterior w master at top plate on first floor, additional venting required.
PLM96-02242 INSP - Plumbing Rough-in8/1/19968/1/19968/2/1996 12:00:00 AMPFAIL
08/01/96 330 - FIXTURE COUNT- 15 18 fu, test water system, mid-stoty st pb,check manufacturers crimp ring installation requirements -some have l space from end of pipe.
PLM96-02230 INSP - Sprinkler & Backflow7/31/19968/1/19968/1/1996 12:00:00 AMAFAIL
08/01/96 330 - 2 unions, 12" clear space, plug test ports, roll test por
PLM96-02231 INSP - Sprinkler & Backflow7/31/19968/1/19968/1/1996 12:00:00 AMAFAIL
08/01/96 330 - raise valve, expose tie in