PLM96-01694
| INSP - Final | 7/31/1996 | 8/1/1996 | 8/1/1996 12:00:00 AM | A | CANC |
|
|
LATE AM PLEASE 347
|
PLM96-02207
| INSP - Plumbing Rough-in | 8/1/1996 | 8/1/1996 | 8/1/1996 12:00:00 AM | A | PASS |
|
|
08/01/96 352 - reinspection
|
PLM96-02236
| INSP - Ground work | 7/31/1996 | 8/1/1996 | 8/1/1996 12:00:00 AM | A | PASS |
|
|
08/01/96 352 - BASEMENT GROUNDWORK
|
PLM96-02237
| INSP - Plumbing Rough-in | 8/1/1996 | 8/1/1996 | 8/1/1996 12:00:00 AM | P | PASS |
|
|
08/01/96 352 - 1-wc 1-lav 1-ts 1-ks 1-wh 1-wb
|
PLM96-02238
| INSP - Sewer/Water lines-FINAL | 8/1/1996 | 8/1/1996 | 8/1/1996 12:00:00 AM | P | PASS |
|
|
08/01/96 352 -
|
PLM96-00070
| INSP - Final | 8/1/1996 | 8/1/1996 | 8/1/1996 12:00:00 AM | P | PASS |
|
|
08/01/96 352 -
|
PLM96-00912
| INSP - Final | 8/1/1996 | 8/1/1996 | 8/1/1996 12:00:00 AM | P | FAIL |
|
|
08/01/96 352 - no drain in basment wh relief required to be run outside
|