BLD00-00919
| BLD-Energy code compliance | 7/31/2000 | 8/1/2000 | 8/1/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/31/2000 at 15:02:29. Contact: ###-####. c/n ok 8/1/2000 8:32:55 AM
|
BLD00-01351
| BLD-Framing/Rough-in | 7/31/2000 | 8/1/2000 | 8/1/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/31/2000 at 15:11:18. Contact: ###-####. c/n, wattsun, brg block at t-12, etc. Do not insul til new wattsun 8/1/2000 9:24:50 AM
|
BLD00-01646
| BLD-Framing/Rough-in | 7/31/2000 | 8/1/2000 | 8/1/2000 12:00:00 AM | A | FAIL |
|
|
Mike ###-####; verify 1hr wall, draft stops. ok to continue, chk at final 8/1/2000 11:39:06 AM 8/1/2000 11:39:19 AM 8/1/2000 11:41:17 AM
|
BLD00-01592
| BLD-Final | 7/31/2000 | 8/1/2000 | 8/1/2000 12:00:00 AM | A | PASS |
|
|
|
BLD00-00779
| BLD-Final | 7/31/2000 | 8/1/2000 | 8/1/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/31/2000 at 22:36:56. Contact: ###-####.c/n, seal ext. grading, debris, exhaust fans, underfloor beam, etc 8/1/2000 10:57:14 AM
|
BLD00-00479
| BLD-Final | 7/27/2000 | 8/1/2000 | 8/1/2000 12:00:00 AM | A | FAIL |
|
|
###-#### nick; c/n, stairs, rails at ext. exit signs 8/1/2000 10:09:13 AM
|
MIS00-00186
| BLD-Final | 8/1/2000 | 8/1/2000 | 8/1/2000 12:00:00 AM | P | PART |
|
|
FOR BLOCK & TIE --PAULINE ###-#### ; tie downs ok 8/1/2000 10:39:11 AM
|
BLD00-01565
| BLD-Framing/Rough-in | 8/1/2000 | 8/1/2000 | 8/1/2000 12:00:00 AM | P | PART |
|
|
dry wall ###-#### Mike; gyp at 2hr wall 8/1/2000 4:26:49 PM
|
BLD00-01711
| BLD-Framing/Rough-in | 8/1/2000 | 8/1/2000 | 8/1/2000 12:00:00 AM | P | NR |
|
|
ROY-- ###-####- BEEPER FR; called twice, left msg, no response 4:00 pm 8/1/2000 4:29:13 PM
|
BLD00-00080
| BLD-Other | 7/31/2000 | 8/1/2000 | 7/31/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 07/31/2000 at 14:26:08. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 07/31/2000 at 14:27:51.
|