PLM01-02563
| Groundwork | 7/31/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-02564
| Groundwork | 7/31/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM00-03976
| PLM-Aging Inspection | 8/1/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | A | NR |
|
|
Added by Inspector: 330 On 8/1/2001 9:29:33 AM still working
|
PLM99-00814
| PLM-Aging Inspection | 8/1/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | A | NR |
|
|
Added by Inspector: 330 On 8/1/2001 9:42:38 AM still working
|
PLM01-01874
| Roof Drains | 7/31/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 15:16:45. Contact: ###-####. test failed 8/1/2001 11:11:32 AM
|
PLM01-02571
| Water and/or Sewer | 8/1/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | P | NR |
|
|
###-####
|
PLM01-02205
| Final | 8/1/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/01/2001 at 10:24:07. Contact: ###-####.final ok with air gap at water heater t&p drain 8/1/2001 1:28:33 PM
|
PLM01-02578
| Groundwork | 8/1/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM01-02585
| Med/Gas Systems | 8/1/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 8/1/2001 4:42:44 PM vacuum pipe sizes are not installed in accordance with approved plans, provide stamped plans from the engineer showing installed sizing IF they meet design requirements. temp occ ok
|
PLM01-02040
| Plumbing Rough-in | 7/31/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 14:17:02. Contact: ###-####. cancel per bob
|
PLM01-02041
| Plumbing Rough-in | 7/31/2001 | 8/1/2001 | 8/1/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/31/2001 at 14:18:26. Contact: ###-####.--cancel per bob
|