Inspections for the day of: Wednesday, August 1, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Arcoraci
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01652 BLD-Framing/Rough-in7/30/20018/1/20018/1/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/30/2001 at 11:39:28. Contact: ###-####.
BLD01-01652 BLD-Energy code compliance7/30/20018/1/20018/1/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/30/2001 at 11:40:00. Contact: ###-####.
BLD01-00361 BLD-Footing7/31/20018/1/20018/1/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/31/2001 at 12:46:32. Contact: ###-####.
BLD01-01962 BLD-Foundation7/31/20018/1/20018/1/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/31/2001 at 20:43:56. Contact: ###-####. steel on site boards not on site 7/31/2001 10:30:56 PM
BLD01-01446 BLD-Foundation7/31/20018/1/20018/1/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/31/2001 at 23:24:37. Contact: ###-####. appears ok 7/31/2001 11:29:43 PM
BLD01-01752 BLD-Framing/Rough-in8/1/20018/1/20018/1/2001 12:00:00 AMPPASS
###-####
BLD01-02002 BLD-Conference8/1/20018/1/20018/1/2001 12:00:00 AMPPASS
for conf-- ed ###-#### ok for hesder at fur out with proper connections 8/1/2001 2:20:08 AM
BLD01-00440 BLD-Framing/Rough-in7/31/20018/1/20018/1/2001 12:00:00 AMPPASS
Scheduled by Inspector: 408 On 7/31/2001 10:03:27 PM
BLD01-00254 BLD-Framing/Rough-in7/31/20018/1/20018/1/2001 12:00:00 AMPPART
###-#### JACK install h-1 clips and blocks 8/1/2001 1:49:07 AM