Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR00-00635 INSP-Final Inspection7/27/20018/1/20018/2/2001 12:00:00 AMPPASS
Steve ###-#### after 1 pm
BLD98-01809 FIRE-Final Inspection7/27/20018/1/20018/2/2001 12:00:00 AMPPASS
Steve ###-#### after 1 please
FIR01-00299 INSP-Final Inspection7/31/20018/1/20018/2/2001 12:00:00 AMPPASS
steve-- ###-#### fire fn
FIR01-00365 INSP-Final Inspection8/1/20018/1/20018/2/2001 12:00:00 AMPFAIL
Steve ###-#### need detector in room 102E 8/3/2001 9:28:53 AM
BLD01-02039 FIRE-Final Inspection7/31/20018/1/20018/1/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 07/31/2001 at 15:40:02. Contact: ###-####. fire inspection not required; called contractor about the error 8/1/2001 8:33:08 AM
FIR01-00367 INSP-Sprinkler Rough-in/Hydro7/31/20018/1/20018/1/2001 12:00:00 AMAPASS
###-#### hydro okay and r/i; okay to cover 8/1/2001 1:32:48 PM
BLD01-01314 FIRE-Final Inspection8/1/20018/1/20018/1/2001 12:00:00 AMAPART
Added by Inspector: 409 On 8/1/2001 10:49:52 AM temp occ approved per Dave Miller; fire alarm plans submitted and field inspector to witness acceptance of voluntary alarm system.
FIR01-00351 INSP-Final Inspection8/1/20018/1/20018/1/2001 12:00:00 AMPPASS
Added by Inspector: 409 On 8/1/2001 1:34:58 PM
FIR01-00328 INSP-Final Inspection8/1/20018/1/20018/1/2001 12:00:00 AMPPASS
Added by Inspector: 409 On 8/1/2001 1:34:30 PM
FIR01-00047 INSP-Sprinkler Rough-in/Hydro8/1/20018/1/20018/1/2001 12:00:00 AMPPART
Scheduled by Inspector: 409 On 8/1/2001 1:47:52 PM hydro on overhead okay. 8/1/2001 2:57:30 PM
FIR01-00107 INSP-Sprinkler Rough-in/Hydro7/31/20018/1/20018/1/2001 12:00:00 AMPCANC
###-#### wrong permit called in. 8/1/2001 2:57:09 PM
FIR00-00405 INSP-Sprinkler Rough-in/Hydro8/1/20018/1/20018/1/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/01/2001 at 07:51:55. Contact: ###-####. first floor hydro okay 8/1/2001 3:57:03 PM
BLD01-01349 FIRE-Final Inspection8/1/20018/1/20018/1/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/01/2001 at 09:14:22. Contact: . 8/1/2001 1:33:16 PM
BLD01-01314 FIRE-Final Inspection8/1/20018/1/20018/1/2001 12:00:00 AMPPART
###-#### double entry; per Dave Miller temp occ approved pending alarm installation; plans submitted on 7/27/01 8/1/2001 10:51:31 AM