PLM02-01475
| Final | 7/31/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 07/31/2002 at 11:43:30. Contact: ###-####.
|
PLM02-01492
| Final | 7/31/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/31/2002 at 13:32:43. Contact: ###-####. still no pvb on eyewash 8/1/2002 9:39:14 AM
|
PLM02-02352
| Water and/or Sewer | 7/31/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | A | PASS |
|
|
###-#### BOB partial water service ok from new meter to with in 10' of rear of the building 7/31/2002 3:48:46 PM
|
PLM02-01853
| Final | 7/31/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | A | FAIL |
|
|
KEY CODE 8888 ###-#### GREG needs a sprinkler permit prior to final 8/1/2002 9:32:41 AM
|
PLM02-01596
| Water and/or Sewer | 7/31/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/31/2002 at 15:41:12. Contact: .
|
PLM02-02365
| Groundwork | 7/31/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | A | PART |
|
|
gary later the better; Phone #: ###-#### just needs end of the line co 8/1/2002 10:28:59 AM
|
PLM02-01621
| Final | 8/1/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | P | PASS |
|
|
; Phone #: ###-####
|
PLM02-02365
| Groundwork | 8/1/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | P | PASS |
|
|
check for end of the line c.o.
|
PLM02-01475
| Final | 8/1/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | P | PASS |
|
|
1:30
|
PLM02-02371
| Plumbing Rough-in | 8/1/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | P | FAIL |
|
|
###-#### hang service piping in the crawlspace, hang 3" waste above the 1/2 bath so waste line isn't hanging off the closet flange, provide a 3" c.o. for the waste line to the full bath on the ground floor. 8/1/2002 2:17:04 PM 8/1/2002 2:17:34 PM
|
PLM02-02374
| Water and/or Sewer | 8/1/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | P | PASS |
|
|
###-#### steve
|
PLM02-00228
| Final | 8/1/2002 | 8/1/2002 | 8/1/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/01/2002 at 11:27:32. Contact: ###-####. secure dcva, install wb face plates, lav, wh, or meter leak in the following rooms 102,104,105,106,202,203,204,206,304,306. following rooms have no k.s. 102,104,202,204,302,304. turn on the water ro all fixtures in room 105, c.o.s seem to have been rocked over. 8/1/2002 4:41:28 PM
|