Inspections for the day of: Thursday, August 1, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-01475 Final7/31/20028/1/20028/1/2002 12:00:00 AMANH
Scheduled by a contractor via Hello! on 07/31/2002 at 11:43:30. Contact: ###-####.
PLM02-01492 Final7/31/20028/1/20028/1/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/31/2002 at 13:32:43. Contact: ###-####. still no pvb on eyewash 8/1/2002 9:39:14 AM
PLM02-02352 Water and/or Sewer7/31/20028/1/20028/1/2002 12:00:00 AMAPASS
###-#### BOB partial water service ok from new meter to with in 10' of rear of the building 7/31/2002 3:48:46 PM
PLM02-01853 Final7/31/20028/1/20028/1/2002 12:00:00 AMAFAIL
KEY CODE 8888 ###-#### GREG needs a sprinkler permit prior to final 8/1/2002 9:32:41 AM
PLM02-01596 Water and/or Sewer7/31/20028/1/20028/1/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/31/2002 at 15:41:12. Contact: .
PLM02-02365 Groundwork7/31/20028/1/20028/1/2002 12:00:00 AMAPART
gary later the better; Phone #: ###-#### just needs end of the line co 8/1/2002 10:28:59 AM
PLM02-01621 Final8/1/20028/1/20028/1/2002 12:00:00 AMPPASS
; Phone #: ###-####
PLM02-02365 Groundwork8/1/20028/1/20028/1/2002 12:00:00 AMPPASS
check for end of the line c.o.
PLM02-01475 Final8/1/20028/1/20028/1/2002 12:00:00 AMPPASS
1:30
PLM02-02371 Plumbing Rough-in8/1/20028/1/20028/1/2002 12:00:00 AMPFAIL
###-#### hang service piping in the crawlspace, hang 3" waste above the 1/2 bath so waste line isn't hanging off the closet flange, provide a 3" c.o. for the waste line to the full bath on the ground floor. 8/1/2002 2:17:04 PM 8/1/2002 2:17:34 PM
PLM02-02374 Water and/or Sewer8/1/20028/1/20028/1/2002 12:00:00 AMPPASS
###-#### steve
PLM02-00228 Final8/1/20028/1/20028/1/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/01/2002 at 11:27:32. Contact: ###-####. secure dcva, install wb face plates, lav, wh, or meter leak in the following rooms 102,104,105,106,202,203,204,206,304,306. following rooms have no k.s. 102,104,202,204,302,304. turn on the water ro all fixtures in room 105, c.o.s seem to have been rocked over. 8/1/2002 4:41:28 PM