Inspections for the day of: Friday, August 1, 2003.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01116 BLD-Framing/Rough-in7/31/20038/1/20038/1/2003 12:00:00 AMAPART
###-#### jenny; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreok except need braces at top of new walls posted c/n. 8/1/2003 12:40:49 PM
BLD03-01071 BLD-Conference7/31/20038/1/20038/1/2003 12:00:00 AMAFAIL
call ###-#### 1/2 prior. 7/31/2003 6:45:58 PM Went to site met with builder he said he called the office to ask if a shear inspection would be required, some one told him a framing inspection and insulation inspection would be required only, The house is papered and wired ready for stucco, we pelled back some areas at hold downs and they had been nailed, then at the lower front there were some walls which the enginner wanted a little tighter pattern for staple , it appead by the removal of some paper and wire that this was alittle short so they will add some more at these front panels. NOTE:The entire house has been done in osb , so there is more shear than would be required by minimum code. code. 8/1/2003 4:07:14 PM
BLD02-01061 BLD-Framing/Rough-in7/31/20038/1/20038/1/2003 12:00:00 AMAPART
BLD02-02716 BLD-Framing/Rough-in7/31/20038/1/20038/1/2003 12:00:00 AMAPART
BLD02-01071 BLD-Framing/Rough-in7/31/20038/1/20038/1/2003 12:00:00 AMAPART
BLD02-01064 BLD-Framing/Rough-in7/31/20038/1/20038/1/2003 12:00:00 AMAPART
BLD02-02716 BLD-Framing/Rough-in7/31/20038/1/20038/1/2003 12:00:00 AMAPART
BLD02-01060 BLD-Framing/Rough-in7/31/20038/1/20038/1/2003 12:00:00 AMAPART
BLD03-01320 BLD-Framing/Rough-in7/31/20038/1/20038/1/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 7/31/2003 at 9:18:42 AM. Contact: ###-####. Insulated at time of inspection framing and insulation ok did note to provide means of support forinsulation in crawl. check at final. 8/1/2003 11:19:21 AM
BLD03-01335 BLD-Framing/Rough-in7/31/20038/1/20038/1/2003 12:00:00 AMAPASS
brian ceiling; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD03-00335 BLD-Final7/31/20038/1/20038/1/2003 12:00:00 AMPPART
###-#### REINSPECTION Ok temp oc only item is conference table 34 high max. Special inspection ok final letter. 8/1/2003 3:10:10 PM
MEC03-02048 Rough-in7/31/20038/1/20038/1/2003 12:00:00 AMPPASS
###-#### a-1
BLD03-01028 BLD-Energy code compliance7/30/20038/1/20038/1/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 7/30/2003 at 8:41:48 AM. Contact: ###-####. Left c/n to complete shear c/n and foam seal prior to calling for a frame inspection, called framer. 8/1/2003 4:11:09 PM
BLD03-01691 BLD-Footing8/1/20038/1/20038/1/2003 12:00:00 AMPCANC
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-01612 BLD-Final8/1/20038/1/20038/1/2003 12:00:00 AMPNR
jefferson; Phone #: ###-#### Internet Inspection Request from: Barbara MooreNew plans wanted some screws at 6 foot metal shelves to walls went over plan with person on site. 8/1/2003 4:09:33 PM