FIR05-00524
| FIR-Aging Inspection | 8/1/2006 | 8/1/2006 | 8/2/2006 1:39:22 PM | | DEFR |
|
|
|
FIR06-00238
| INSP-Sprinkler Rough-in/Hydro | 8/1/2006 | 8/1/2006 | 8/2/2006 11:35:05 AM | P | PART |
|
|
UG hydrostatic test performed satisfactory.
|
FIR05-00632
| INSP-Final Inspection | 7/31/2006 | 8/1/2006 | 8/2/2006 8:05:15 AM | P | DEFR |
|
|
No time available to complete this inspection today, to be done 8/2 per agreement.
|
FIR06-00487
| INSP-Sprinkler Rough-in | 8/1/2006 | 8/1/2006 | 8/2/2006 8:01:20 AM | P | DEFR |
|
|
Inspection to be completed 8/2
|
BLD05-02838
| FIRE-Final Inspection | 8/1/2006 | 8/1/2006 | 8/1/2006 4:19:33 PM | P | PASS |
|
|
Fire life safety is acceptable, inspection passed.
|
BLD06-00863
| FIRE-Final Inspection | 7/31/2006 | 8/1/2006 | 8/1/2006 3:48:20 PM | A | FAIL |
|
|
The project related alarm permit must be inspected, approved and finaled prior to BLD life safety final.
|
FIR06-00430
| INSP-Final Inspection | 7/31/2006 | 8/1/2006 | 8/1/2006 3:06:49 PM | P | PASS |
|
|
Fire alarm work tested satisfactory, inspection passed.
|
FIR06-00210
| INSP-Final Inspection | 7/31/2006 | 8/1/2006 | 8/1/2006 12:18:17 PM | A | FAIL |
|
|
Inspectors test and main drain line not completed to allow final testing, need to attatch hyd. calc. sticker, provide locking means for the main control valves, one painted head under the stairs was replaced while on site.
|
FIR06-00210
| INSP-Supply line flush | 7/31/2006 | 8/1/2006 | 8/1/2006 12:14:48 PM | A | PART |
|
|
UG supply line flush performed satisfactory.
|
BLD06-00658
| FIRE-Conference | 7/31/2006 | 8/1/2006 | 8/1/2006 11:00:28 AM | A | DONE |
|
|
Confrence with GC to discuss building addressing (number size, location), core and shell life safety requirements, and fire lane marking.
|
BLD06-01422
| FIRE-Final Inspection | 7/31/2006 | 8/1/2006 | 8/1/2006 10:49:06 AM | A | PASS |
|
|
Scope of work to install metal framing only for demising wall, existing smoke evac. system to be verified at future TI permit for occupancy inspections.
|
BLD06-02078
| FIRE-Final Inspection | 7/31/2006 | 8/1/2006 | 8/1/2006 10:44:49 AM | A | FAIL |
|
|
Need to provide current certification tag on the provided fire extinguisher and mount on the wall as discussed, provide approved door hardware at the restroom door, need to final fire sprinkler permit pending ceiling tile install, provide test of existing smoke evac system for verification of functionality.
|
FIR06-00547
| INSP-Sprinkler Rough-in | 7/31/2006 | 8/1/2006 | 8/1/2006 10:41:34 AM | A | PART |
|
|
OH fire sprinkler rough-in is good for cover at the drop ceiling areas, final pending ceiling tile and escutcheons.
|
FIR06-00546
| INSP-Sprinkler Rough-in | 7/31/2006 | 8/1/2006 | 8/1/2006 9:41:49 AM | A | PART |
|
|
OH inspection for the 3 heads in the RAD room only as marked on approved plans is acceptable.
|