Inspections for the day of: Wednesday, August 1, 2007.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-00978 FIRE-Final Inspection8/1/20078/1/20078/1/2007 4:49:42 PMPFAIL
The life safety will be ok to pass when the fire alarm permit is finaled
BLD07-00979 FIRE-Final Inspection7/31/20078/1/20078/1/2007 4:47:57 PMPPASS
Life safety passed
FIR07-00569 INSP-Final Inspection7/31/20078/1/20078/1/2007 4:46:46 PMPFAIL
The hvac units would not go into heat mode for some reason so no test was performed for shut down. I had the electrical contractor update the map at the facp and the zone list in the facp.
BLD07-00135 FIRE-Final Inspection8/1/20078/1/20078/1/2007 4:39:33 PMPFAIL
Life safety will be ok to pass when the fire sprinkler permit is finaled
FIR07-00261 INSP-Sprinkler Rough-in8/1/20078/1/20078/1/2007 4:37:18 PMPFAIL
Of all the sprinkler pendants in the room one of them is a standard responce where as the others are quick. Also three canopies are missing
BLD07-00014 FIRE-Final Inspection8/1/20078/1/20078/1/2007 4:35:45 PMPCANC
matt called and said that he would not be ready today due to a indicator issue
FIR07-00561 INSP-Sprinkler Rough-in7/31/20078/1/20078/1/2007 1:17:33 PMPFAIL
Mike wanted the piping above the soffit to be inspected but I found that the 2 1/2" piping on the plan is actually 3" piping in the field. Also it appears the piping running back to the riser may be a different size. Also per the fire sprinkler contractor alot of heads have added and as-builts have been submitted but this main size issue has not been reflected on the as-built plans.
FIR07-00338 INSP-Sprinkler Rough-in/Hydro7/31/20078/1/20078/1/2007 12:48:04 PMAFAIL
The plans do not match the installation. For example the riser has been relocated 15' south and two additional rooms have been added to the building which will cause the remote area to be moved to the south. The backflow device installed is not what was submitted. Additional hangers are required. The riser has been installed as cpvc and does not meet the installation requirements of cpvc installation. The plans show the riser to be sch 40 galv. Plans need to be resubmitted. I only looked at the south most building before stopping the inspection