Inspections for the day of: Wednesday, August 1, 2007.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWilliam E Thomas
TitleELE-INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE07-00953 Final7/31/20078/1/20078/1/2007 5:01:16 PMAPASS
dan; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
final ok
ELE07-01847 Final8/1/20078/1/20078/1/2007 4:51:30 PMPFAIL
Greg ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
1. Must remove the cieling tiles.
ELE07-02698 Electrical Rough-In8/1/20078/1/20078/1/2007 4:23:31 PMPCANC
Ready for final inspection. Call Brian with questions. See receptionist in suite 300, she will take you to suite 350 (location of work). They are available from 8a-5p every day. Thanks! Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
1. must remove cieling tiles to see the work.
ELE07-01312 Electrical Rough-In8/1/20078/1/20078/1/2007 3:38:17 PMPFAIL
ceiling rough in contact sid ###-#### Phone #: ###-#### Internet Inspection Request from: JENNY EMEL
1. The Contractors work was fine, the cieling electrical passes.
2. Low Voltage cables were on the grid.
ELE07-02193 Final8/1/20078/1/20078/1/2007 3:00:04 PMPPASS
paul Phone #: ###-#### Note: please 15 min to have access
1. final ok
ELE07-02681 Rough-In Permanent Service7/31/20078/1/20078/1/2007 2:03:26 PMPPASS
ELCTRICAL R/I SERVICE CONTACT JACK Phone #: ###-#### Internet Inspection Request from: Emmet Bushman
1. ri ok
2. p/s u/g n ok
ELE07-02680 Final8/1/20078/1/20078/1/2007 1:43:25 PMPPASS
turning off power at 8AM sould be ready by 2PM inspection so I can get power turned back on. Thanks Phone #: ###-#### Internet Inspection Request from: Ron Zimmerman
1. final ok
ELE07-02680 Rough-In Permanent Service8/1/20078/1/20078/1/2007 1:41:03 PMPPASS
turning off power at 8AM sould be ready by 2PM inspection so I can get power turned back on. Thanks Phone #: ###-#### Internet Inspection Request from: Ron Zimmerman
1. ri ok
2. p/s o/h reconnect/new ok
ELE07-00512 Final7/31/20078/1/20078/1/2007 12:39:57 PMAPASS
Phone #: ###-#### Internet Inspection Request from: Steve Craig
final ok
ELE07-02687 Temporary Service7/31/20078/1/20078/1/2007 12:39:41 PMAPASS
Any questions or concerns please call Clay at ###-####. Thanks. Phone #: ###-#### Internet Inspection Request from: Clay Morgan
1. t/s o/h n ok
ELE07-01753 Final7/31/20078/1/20078/1/2007 12:38:49 PMAPASS
WE HAVE HAD OUR RUFF IN, PERM SERV AND ARE READY FOR THE FINAL. THANKS Phone #: ###-#### Internet Inspection Request from: BRENDA HURST
1. final ok.
ELE07-00573 Electrical Rough-In7/31/20078/1/20078/1/2007 12:38:07 PMAPART
Scheduled by a contractor via Hello! on 7/31/2007 at 1:26:09 PM. Contact: ###-####.
1. as noted on prints ok.