BLD08-01553
| BLD-Final | 7/31/2008 | 8/1/2008 | 8/1/2008 4:28:38 PM | P | FAIL |
|
|
kelly Phone #: ###-#### remove ceilling tile over stairs to expose sidewall head.
|
BLD07-02730
| BLD-Final | 7/31/2008 | 8/1/2008 | 8/1/2008 4:19:53 PM | P | PASS |
|
|
Rob Phone #: ###-#### 1.5/12 pitch roof covered with low pitch rolled rooffing listed by certainteed rooffing listing for this aplaction.
|
BLD07-02730
| DOC - Permit Finaled | 8/1/2008 | 8/1/2008 | 8/1/2008 4:17:53 PM | P | PASS |
|
|
|
ESC08-00480
| Random Inspection | 8/1/2008 | 8/1/2008 | 8/1/2008 2:38:02 PM | P | PASS |
|
|
|
BLD08-01188
| BLD-Conference | 8/1/2008 | 8/1/2008 | 8/1/2008 2:35:30 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/1/2008 at 10:01:50 AM. Contact: ###-####. first layer of ceilling assembly ok for cover.
|
BLD08-00965
| BLD-Final | 7/30/2008 | 8/1/2008 | 8/1/2008 2:00:02 PM | A | NR |
|
|
stan-- call 1st before insp Phone #: ###-#### need other sign offs
|
ESC07-01530
| Random Inspection | 8/1/2008 | 8/1/2008 | 8/1/2008 1:59:14 PM | A | PASS |
|
|
|
BLD07-03163
| BLD-Framing/Rough-in | 7/31/2008 | 8/1/2008 | 8/1/2008 1:58:59 PM | A | PART |
|
|
Scheduled by a contractor via Hello! on 7/31/2008 at 1:52:57 PM. Contact: ###-####. perpendiculat membrane penatration fire stopping ok for cover.
|
BLD07-03136
| BLD-Final | 7/30/2008 | 8/1/2008 | 8/1/2008 9:45:43 AM | A | PART |
|
|
jim Phone #: ###-#### temp ok
|
BLD07-03137
| BLD-Final | 7/30/2008 | 8/1/2008 | 8/1/2008 9:45:11 AM | A | PART |
|
|
jim Phone #: ###-#### temp ok
|