ELE08-01862
| Electrical Rough-In | 8/1/2008 | 8/1/2008 | 8/1/2008 5:05:31 PM | P | PASS |
|
|
Two floor boxes Phone #: ###-#### Internet Inspection Request from: Jim Williams ok to cover 2 floor boxes only
|
ESC08-00263
| General Inspection | 8/1/2008 | 8/1/2008 | 8/1/2008 4:41:35 PM | P | PASS |
|
|
called rp, left mwssage, talked with structural, looked ok
|
ESC08-00262
| General Inspection | 8/1/2008 | 8/1/2008 | 8/1/2008 4:19:25 PM | P | PART |
|
|
called rp, called structural, asked about dust, ok
|
ESC08-00152
| General Inspection | 8/1/2008 | 8/1/2008 | 8/1/2008 3:38:17 PM | P | PART |
|
|
looked ok
|
ESC06-00888
| General Inspection | 8/1/2008 | 8/1/2008 | 8/1/2008 3:08:47 PM | A | CANC |
|
|
looked ok
|
ELE08-02141
| Electrical Rough-In | 8/1/2008 | 8/1/2008 | 8/1/2008 2:39:29 PM | P | PASS |
|
|
SPENCER - NOTE: TRENCH DETACH GARAGE Phone #: ###-#### ok to cover u/g house to garage
|
ELE08-02140
| Electrical Rough-In | 8/1/2008 | 8/1/2008 | 8/1/2008 1:46:05 PM | P | PASS |
|
|
SPENCER - NOTE: TRENCH DETACH GARAGE Phone #: ###-#### ok to cover u/g house to garage
|
ESC07-00473
| General Inspection | 8/1/2008 | 8/1/2008 | 8/1/2008 12:59:56 PM | A | PART |
|
|
looked ok
|
ELE08-02136
| Permanent Service | 8/1/2008 | 8/1/2008 | 8/1/2008 12:31:19 PM | P | PASS |
|
|
As early as possible, so we can get Idaho Power back to rehook power. Thanks Phone #: ###-#### Internet Inspection Request from: Barbara Szurgot p/s u/g rec ok,no esc this project
|
ELE08-02118
| Electrical Rough-In | 7/31/2008 | 8/1/2008 | 8/1/2008 10:05:31 AM | A | PASS |
|
|
Contact: John Ostolasa Phone #: ###-#### Internet Inspection Request from: Deb Gooden wall only ok to cover, no esc this project
|
ELE08-02131
| Electrical Rough-In | 8/1/2008 | 8/1/2008 | 8/1/2008 9:27:31 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/1/2008 at 7:21:31 AM. Contact: ###-####. u/g ok to cover north and east side and sign u/g- will call for west and east next week
|
ELE08-02111
| Electrical Rough-In | 7/31/2008 | 8/1/2008 | 8/1/2008 8:40:56 AM | A | PASS |
|
|
inspection for the back patio//Nathan Gross ###-#### ric ok, no esc this project
|
ELE07-04103
| Final | 7/31/2008 | 8/1/2008 | 8/1/2008 8:02:08 AM | A | PASS |
|
|
Kyle- call for access Phone #: ###-#### ok to final
|