PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, August 1, 2013
.
Number of inspections:
17
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Kimberly M. Johnson
Title
EROSION CONTROL
Phone #
208-794-3958
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC13-00641
Site Final
8/1/2013
8/1/2013
8/9/2013 5:01:28 PM
P
FAIL
Cannot final until new permit is issued.
ESC13-00034
Aging Inspection
8/1/2013
8/1/2013
8/6/2013 7:03:05 AM
CANC
ESC13-00230
General Inspection
8/1/2013
8/1/2013
8/2/2013 4:04:11 PM
PART
Silt fence needs repaired. Entire site looks to be active. Dust under control despite traffic on disturbed area and earth work
ESC13-00013
BMP Violation
7/31/2013
8/1/2013
8/1/2013 2:38:02 PM
P
FAIL
SWO issued: repair silt fence; sweep side walk and gutter. Chance of T-storms tonight
ESC13-00401
Random Inspection
8/1/2013
8/1/2013
8/1/2013 1:33:24 PM
P
FAIL
Entire backyard/slope has been disturbed and is bare dirt for new landscaping. This was not approved in the waiver. Permit has been modified to reflect this additional disturbance and a modification fee of $78.75 is due. Landscapers expect sod to be installed in one week. Will re-inspect 8/9. Will issue SWO if fee and sod is not in by 8/9.
ESC13-00158
DOC - Permit Finaled
8/1/2013
8/1/2013
8/1/2013 1:15:47 PM
P
PASS
see ESC13-00401 for vertical construction
ESC13-00339
General Inspection
8/1/2013
8/1/2013
8/1/2013 11:23:32 AM
FAIL
Written correction notice: 1. Install RECP jute matting per spec as discussed on 7/11. 2. Clean up concrete washout not contained in pit; schedule maintanance on pit as it is near full capacity. 3. Sweep gutter regularly as needed. Failure to address these by next inspection will result in a SWO.
ESC12-00634
DOC - Permit Finaled
8/1/2013
8/1/2013
8/1/2013 10:58:35 AM
P
PASS
ESC12-00633
DOC - Permit Finaled
8/1/2013
8/1/2013
8/1/2013 10:58:15 AM
P
PASS
ESC12-00632
DOC - Permit Finaled
8/1/2013
8/1/2013
8/1/2013 10:57:55 AM
P
PASS
ESC12-00631
DOC - Permit Finaled
8/1/2013
8/1/2013
8/1/2013 10:57:17 AM
P
PASS
ESC13-00288
General Inspection
8/1/2013
8/1/2013
8/1/2013 10:53:58 AM
FAIL
Written Correction Notice: to amend ECP project schedule. Not even close to final completion. Trash needs cleaned up; Needs dust control where pulling from stockpile. Maintain street sweeping as needed; improve construction exits as neccessary (50' min, clean 2' plus rock); Concrete washout needs improvement ; Evidence of runoff running toward street from pump truck on ground by existing washout location; Post ESC sign
ESC13-00250
General Inspection
8/1/2013
8/1/2013
8/1/2013 9:46:36 AM
PASS
Inlet protection still in good shape. building demo close to complete; still actively working disturbed areas.
ESC12-00681
General Inspection
8/1/2013
8/1/2013
8/1/2013 9:36:45 AM
PASS
Has not achieved any vegetation yet. Will need to continue maintaining temp stabilization until vegetation grows in. Note: site is contoured inward; little to no risk of runoff
ESC13-00213
General Inspection
8/1/2013
8/1/2013
8/1/2013 9:20:29 AM
P
FAIL
Supplement to previous entry: must protect storm drains down gradient on Castello.
ESC11-00879
General Inspection
8/1/2013
8/1/2013
8/1/2013 9:16:58 AM
PASS
ESC13-00013
Stop Work Order
8/1/2013
8/1/2013
8/1/2013 12:00:00 AM
P
DONE