Inspections for the day of: Monday, August 1, 2016.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR16-00266 INSP-Sprinkler Rough-in8/1/20168/1/20168/1/2016 3:38:14 PMPPASS
Tenting inspection for overhead fire sprinkler piping located in attic area's complete, overhead fire sprinkler piping located in attic spaces approved for cover. Only area's not approved for cover are where the fire sprinkler piping crosses the breeze-way, an approved method to prevent the pipe from freezing needs to be install/inspected before cover is approved. Any of the area's where the fire sprinkler piping crosses the breeze-way that gets covered before approved for cover will have any and all cover material removed for an inspection to be performed.
BLD15-01111 FIRE-Conference8/1/20168/1/20168/1/2016 3:32:20 PMPCANC
Tenting inspection needs to be under FIR16-00266, this inspection request cancelled and a new inspection request for the correct permit will be generated.
FIR16-00320 INSP-Final Inspection8/1/20168/1/20168/1/2016 3:07:19 PMPPASS
Final fire alarm inspection for clean agent suppression system passed/complete
FIR15-00561 INSP-Sprinkler Rough-in8/1/20168/1/20168/1/2016 2:21:27 PMPCANC
Rough to cover inspection cancelled by point of contact, Mark Jensen ( ###-#### ), rough to cover inspection will be rescheduled for a later date.
FIR16-00200 INSP-Final Inspection8/1/20168/1/20168/1/2016 2:00:43 PMPPASS
Final fire sprinkler inspection for pre-action system in 3rd floor server room passed/complete.
FIR15-00751 INSP-Final Inspection8/1/20168/1/20168/1/2016 1:55:38 PMPPART
Partial final inspection complete for core and shell audio visual devices associated with this permit, A/V's on floors 1 through 9 associated with core and shell complete, door holders on floors 5, 6, 7, and 8 have been tested and work correctly, flow switches and tampers on the fire sprinklers floor 1 through 9 have been completed.
FIR15-00751 INSP-Sprinkler Rough-in/Hydro8/1/20168/1/20168/1/2016 1:47:31 PMPCANC
Inspection request for alarm final, not for sprinklers, inspection request cancelled and a new inspection request will be generated.
FIR15-00751 INSP-Conference7/29/20168/1/20168/1/2016 1:45:51 PMADONE
Fire conference complete
FIR15-00329 INSP-Final Inspection8/1/20168/1/20168/1/2016 1:44:10 PMPPASS
Final underground fire sprinkler supply main inspection complete.
FIR16-00227 INSP-Sprinkler Rough-in8/1/20168/1/20168/1/2016 11:00:54 AMPPASS
Rough to cover inspection for overhead fire sprinkler piping located above ceiling grid area's complete, approved for cover.
FIR16-00340 INSP-Sprinkler Rough-in8/1/20168/1/20168/1/2016 10:59:59 AMPPASS
Rough to cover inspection for overhead fire sprinkler piping complete, approved for cover.
FIR15-00705 INSP-Sprinkler Rough-in/Hydro7/29/20168/1/20168/1/2016 10:15:49 AMAPASS
Hydrostatic test for overhead fire sprinkler piping, level 3 annex passed/complete.
FIR16-00465 INSP-Final Inspection7/29/20168/1/20167/29/2016 12:00:00 AMAPASS
Reinspection items corrected. Scope of Work complete. Permit Finaled.