PLM15-01417
| PLM-Aging Inspection | 8/1/2017 | 8/1/2017 | 8/1/2017 4:24:07 PM | | PEND |
|
|
wip
|
PLM17-02853
| Sprinkler (Final) | 8/1/2017 | 8/1/2017 | 8/1/2017 4:23:04 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darrell Roark
|
PLM17-00118
| Final | 8/1/2017 | 8/1/2017 | 8/1/2017 4:12:25 PM | P | NH |
|
|
Call for access // Allen Phone #: ###-####. No answer. tagged door
|
PLM17-01150
| Final | 8/1/2017 | 8/1/2017 | 8/1/2017 4:00:27 PM | P | PASS |
|
|
JOB # 50673. Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM17-02858
| Plumbing Rough-in | 8/1/2017 | 8/1/2017 | 8/1/2017 3:34:42 PM | P | PASS |
|
|
enter through the back of the property Phone #: ###-#### Inspection requested via web by Troy Paulin
|
PLM17-00332
| Final | 8/1/2017 | 8/1/2017 | 8/1/2017 3:22:45 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. Final pending locating the expansion tank on the gym building.
|
PLM15-04179
| PLM-Aging Inspection | 8/1/2017 | 8/1/2017 | 8/1/2017 3:05:55 PM | | CANC |
|
|
|
MIS17-00100
| PLM-Conference | 8/1/2017 | 8/1/2017 | 8/1/2017 3:04:35 PM | P | PEND |
|
|
C of O- Alberto Phone #: ###-####. 1. Have the double check valve premise protection certified. 2. Replace the expansion tank. 3. Remove the valve from the mop sink faucet spout. 4. Perm. cap all unused plumbing. 5. Raise the vacuum breaker on the three compartment sink faucet 12" and support. 6. Support the drain on the three comp. sink. Tenant states no drink machines used. Bakery.
|
PLM16-04510
| Final | 7/31/2017 | 8/1/2017 | 8/1/2017 2:24:49 PM | A | FAIL |
|
|
carl Phone #: ###-####. 1. Provide specifications on the propress fittings showing the maximum temperature rating. 2. Add a vacuum relief valve at the roof piping. 3. Route the t&p piping from the water heater and solar storage tank to an approved receptor. The shower pan or add a trap and aav to the pipe next to the fau. 4. Install a check valve on the cold water feed to the water heater and storage tank. 5. Increase the cold water feed line to 1" or larger. 6. Label all the solar valves. 7. Give written instruction on how to winterize the system. 8. Install a dual wall heat exchanger at the pool and hot tub. 9. Provide a piping diagram of the thermal solar system. 10. The check valve on the 80 gallon wh needs to face up.
|
PLM17-01902
| Groundwork | 7/31/2017 | 8/1/2017 | 8/1/2017 1:22:15 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by david scaggs
|
PLM17-01897
| Plumbing Rough-in | 7/31/2017 | 8/1/2017 | 8/1/2017 1:07:54 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by david scaggs. 1. DWV test failed. Replace broken gauges. 2. Install plate straps at the base of all drain lines at the concrete. 3. 3" cleanouts require 18" clearance. Turn 180 degrees
|
PLM17-02847
| Water Heater Final | 7/31/2017 | 8/1/2017 | 8/1/2017 12:45:52 PM | A | PASS |
|
|
Contact: Robert Church Phone #: ###-#### Inspection requested via web by Brent Lacy
|
PLM17-01815
| Final | 8/1/2017 | 8/1/2017 | 8/1/2017 12:23:10 PM | P | PART |
|
|
7373 ENTER Phone #: ###-#### Inspection requested via web by Ann Marie Reyes. Plumbing ok. Cannot final until landscapers pull a permit for the backflow
|
PLM17-02824
| Other | 7/31/2017 | 8/1/2017 | 8/1/2017 12:15:00 PM | A | CANC |
|
|
Dennis-please call when on your way Phone #: ###-####. Going to pay the extra fees and reschedule
|
PLM17-01767
| Final | 7/31/2017 | 8/1/2017 | 8/1/2017 12:05:28 PM | A | PART |
|
|
7373 ENTER Phone #: ###-#### Inspection requested via web by Ann Marie Reyes. Plumbing ok. Landscapers must pull a plumbing permit prior final
|
PLM17-01296
| Final | 7/31/2017 | 8/1/2017 | 8/1/2017 11:41:20 AM | A | PART |
|
|
REINSPECTION FROM FAILED INSPECTION. PLEASE CALL MARY WHEN ON WAY ###-#### Phone #: ###-#### Inspection requested via web by ron pierce. New plumbing ok. Kitchen flooded due to condensate, hvac. The dishwasher and ice maker need to be reconnected to final
|
PLM17-02693
| Water Heater Final | 8/1/2017 | 8/1/2017 | 8/1/2017 8:07:45 AM | A | PASS |
|
|
|
PLM17-02845
| Water Heater Final | 7/31/2017 | 8/1/2017 | 7/31/2017 4:35:29 PM | P | CANC |
|
|
Hello! Please call Robert @ ###-#### to confirm job is ready for inspection.
Thank you! Phone #: ###-#### >> Inspection requested via web by Rick Borg Inspection cancelled from web by: Rick Borg
|
PLM17-02838
| Plumbing Rough-in | 7/28/2017 | 8/1/2017 | 7/31/2017 3:52:03 PM | A | CANC |
|
|
CONTACT: JAY BEDSOLE, CONTRACTOR, ###-####: MASTER BATHROOM REMODEL ROUGH IN Phone #: ###-#### >> Inspection requested via web by Chris Field Inspection cancelled from web by: Chris Field
|