PLM19-01054
| Water Softner Final | 8/1/2019 | 8/1/2019 | 8/1/2019 3:02:57 PM | P | NH |
|
|
Eric- here is April''s ph ####-####. You wanted to call her before going out. You and her were working out a time. Thank you for all your help. Phone #: ###-#### Inspection requested via web by Michele Johnson-Waiting on callback.
|
PLM19-02494
| Plumbing Rough-in | 8/1/2019 | 8/1/2019 | 8/1/2019 2:52:13 PM | P | PASS |
|
|
Call ahead to meet // Randy Phone #: ###-####
|
PLM19-03040
| Water and/or Sewer | 7/25/2019 | 8/1/2019 | 8/1/2019 2:33:30 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Chris Field-Not ready.
|
MEC19-03351
| Pressure Test | 8/1/2019 | 8/1/2019 | 8/1/2019 2:21:10 PM | P | NR |
|
|
Need a flue pressure test on 2 furnace installations. Phone #: ###-#### Inspection requested via web by Angie Maguire-There is no test on the flues.
|
PLM19-03043
| Water Heater Final | 7/30/2019 | 8/1/2019 | 8/1/2019 2:10:52 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC19-03065
| Pressure Test | 8/1/2019 | 8/1/2019 | 8/1/2019 2:08:48 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino-20 lb gas test fail.
|
MEC19-03065
| Rough-in | 8/1/2019 | 8/1/2019 | 8/1/2019 2:08:22 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Debbie Marino
|
PLM19-02399
| Sprinkler (Final) | 8/1/2019 | 8/1/2019 | 8/1/2019 1:13:02 PM | P | PART |
|
|
RP inspection 2" meter. meter #1055458 Western Power Sports Phone #: ###-#### Inspection requested via web by Brett Klinchuch-Ok to cover, RPBA needs tested.
|
PLM19-03098
| Plumbing Rough-in | 8/1/2019 | 8/1/2019 | 8/1/2019 1:08:01 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Candice Martin
|
PLM19-03112
| Final | 7/31/2019 | 8/1/2019 | 8/1/2019 10:49:56 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Caleb Case-Need to roll Y's on vents above invert of pipe. Need to use DWV fittings. Cannot use mission coupling from pvc to pvc. DWV test fail. Cannot use a comby for a trap arm. Need to fix permit to match scope of work.
|
PLM18-01892
| Final | 8/1/2019 | 8/1/2019 | 8/1/2019 10:45:34 AM | A | CANC |
|
|
|
PLM19-03140
| Final | 7/30/2019 | 8/1/2019 | 8/1/2019 10:42:28 AM | A | PASS |
|
|
Rebath project. Late morning preferred around 10:30 - 11am if possible. Thanks! Inspection requested via web by John Hensley
|
PLM17-04819
| Final | 7/30/2019 | 8/1/2019 | 8/1/2019 9:56:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
PLM18-04154
| Final | 7/30/2019 | 8/1/2019 | 8/1/2019 9:55:50 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
PLM19-03098
| Plumbing Rough-in | 7/31/2019 | 8/1/2019 | 8/1/2019 9:08:43 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by Candice Martin-No access.
|
MIS19-00226
| PLM-Conference | 7/31/2019 | 8/1/2019 | 8/1/2019 8:35:03 AM | A | FAIL |
|
|
Need to pull a plumbing permit.
|
PLM19-03129
| Sprinkler (Final) | 8/1/2019 | 8/1/2019 | 8/1/2019 8:22:40 AM | A | PART |
|
|
Tie in sprinkler with backflow device. Phone #: ###-#### Inspection requested via web by Soubanh Senethavialy-Ok to cover, pvb needs tested.
|
PLM18-04819
| PLM-Aging Inspection | 8/1/2019 | 8/1/2019 | 8/1/2019 6:24:55 AM | | CANC |
|
|
wip
|
PLM19-03157
| Plumbing Rough-in | 7/31/2019 | 8/1/2019 | 8/1/2019 12:00:00 AM | P | CANC |
|
|
THIS WAS CANCEL ON 8-1 BY MARGARITA AT 11:58AM late afternoon // Joe Phone #: ###-####
|
PLM19-03017
| Final | 7/25/2019 | 8/1/2019 | 7/31/2019 3:35:29 PM | P | CANC |
|
|
INSTALLER JAROD ###-#### Phone #: ###-#### >> Inspection requested via web by Aaron Alandt Inspection cancelled from web by: Aaron Alandt
|