Inspections for the day of: Monday, August 10, 1998.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC98-02325 INSP - Framing/ Rough-in8/10/19988/10/19988/10/1998 12:00:00 AMPPART
carol ###-####...c/n, need flue install instruction for hi-eff furnace.
MEC98-02532 INSP - Framing/ Rough-in8/10/19988/10/19988/10/1998 12:00:00 AMPNR
press. test carol ###-####...r/i nr. 342 area?
BLD95-00521 INSP - Final8/10/19988/10/19988/10/1998 12:00:00 AMPFAIL
conf w/ Scott Steed; need htg, fire, & struct finals for c/o...keep c/n
BLD97-02259 INSP - Framing/Rough-in8/7/19988/10/19988/10/1998 12:00:00 AMPFAIL
nailing late pm levar ###-####...1st layer gyp ok at ext wall/lid at break room area. C/N ...need detail for penetration protection at 2hr. area sep. wall. Wall is framed, not cmu as per arch's detail
BLD97-03582 INSP - Framing/Rough-in8/10/19988/10/19988/10/1998 12:00:00 AMPNR
approved insulation system at attic, need listed mat'l used.
BLD98-01361 INSP - Energy code compliance8/10/19988/10/19988/10/1998 12:00:00 AMPPASS
michael ###-#### per ba
BLD98-01361 INSP - Framing/Rough-in8/10/19988/10/19988/10/1998 12:00:00 AMPPASS
discussed frame issues, shear nailing w/ bldr...need shear insp's. conference.
BLD98-01535 INSP - Framing/Rough-in8/10/19988/10/19988/10/1998 12:00:00 AMPPART
ext shear nailing...ok, met w/ Mike Riggs onsite