MEC98-02325
| INSP - Framing/ Rough-in | 8/10/1998 | 8/10/1998 | 8/10/1998 12:00:00 AM | P | PART |
|
|
carol ###-####...c/n, need flue install instruction for hi-eff furnace.
|
MEC98-02532
| INSP - Framing/ Rough-in | 8/10/1998 | 8/10/1998 | 8/10/1998 12:00:00 AM | P | NR |
|
|
press. test carol ###-####...r/i nr. 342 area?
|
BLD95-00521
| INSP - Final | 8/10/1998 | 8/10/1998 | 8/10/1998 12:00:00 AM | P | FAIL |
|
|
conf w/ Scott Steed; need htg, fire, & struct finals for c/o...keep c/n
|
BLD97-02259
| INSP - Framing/Rough-in | 8/7/1998 | 8/10/1998 | 8/10/1998 12:00:00 AM | P | FAIL |
|
|
nailing late pm levar ###-####...1st layer gyp ok at ext wall/lid at break room area. C/N ...need detail for penetration protection at 2hr. area sep. wall. Wall is framed, not cmu as per arch's detail
|
BLD97-03582
| INSP - Framing/Rough-in | 8/10/1998 | 8/10/1998 | 8/10/1998 12:00:00 AM | P | NR |
|
|
approved insulation system at attic, need listed mat'l used.
|
BLD98-01361
| INSP - Energy code compliance | 8/10/1998 | 8/10/1998 | 8/10/1998 12:00:00 AM | P | PASS |
|
|
michael ###-#### per ba
|
BLD98-01361
| INSP - Framing/Rough-in | 8/10/1998 | 8/10/1998 | 8/10/1998 12:00:00 AM | P | PASS |
|
|
discussed frame issues, shear nailing w/ bldr...need shear insp's. conference.
|
BLD98-01535
| INSP - Framing/Rough-in | 8/10/1998 | 8/10/1998 | 8/10/1998 12:00:00 AM | P | PART |
|
|
ext shear nailing...ok, met w/ Mike Riggs onsite
|