Inspections for the day of: Thursday, August 10, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Tawney
TitleFIRE INSPECTOR
Phone #340-1295
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01761 FIRE-Final Inspection8/9/20008/10/20008/10/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/09/2000 at 16:34:24. Contact: . Reinsp. ok for temp. occ. need bldg. alarm system upgrade 8/11/00 12:00:43 PM
BLD00-00639 FIRE-Final Inspection8/9/20008/10/20008/10/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/09/2000 at 10:11:22. Contact: ###-####. final fail C/N issued 8/11/00 12:00:55 PM
BLD98-02858 FIRE-Final Inspection8/9/20008/10/20008/10/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/09/2000 at 15:40:04. Contact: ###-####. Final fail accessible 1st floor rooms. 8/11/00 12:01:32 PM
BLD00-01133 FIRE-Final Inspection8/10/20008/10/20008/10/2000 12:00:00 AMPFAIL
###-#### Final fail C/N issued 8/11/00 12:01:41 PM
BLD00-00830 FIRE-Final Inspection8/10/20008/10/20008/10/2000 12:00:00 AMPPASS
###-#### Reinsp. ok for perm. occ. 8/11/00 12:02:07 PM
BLD99-02651 FIRE-Conference8/10/20008/10/20008/10/2000 12:00:00 AMPPART
jason ###-#### for conf Conf. with contractor & architect. 8/11/00 12:01:54 PM
BLD00-01915 FIRE-Sprinkler Rough-in8/10/20008/10/20008/10/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/10/2000 at 08:29:03. Contact: ###-####. Ok on sprinkler R/I 8/11/00 12:01:18 PM
BLD00-00964 FIRE-Final Inspection8/10/20008/10/20008/10/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/10/2000 at 10:48:49. Contact: . Reinsp. ok for perm. occ. 8/11/00 12:02:25 PM
FIR00-00426 INSP-Sprinkler Rough-in8/10/20008/10/20008/10/2000 12:00:00 AMPPART
Ok on sprinkler R/I