BLD00-01329
| BLD-Framing/Rough-in | 8/9/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | A | PASS |
|
|
shear panel ###-#### reinspeciton
|
BLD00-01697
| BLD-Framing/Rough-in | 8/9/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | A | FAIL |
|
|
Chris ###-#### the plans are top of the fireplace C/N staple up hold downs. 8/11/2000 9:20:12 AM
|
BLD00-00255
| BLD-Framing/Rough-in | 8/9/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | A | PART |
|
|
David Reid ###-#### Hallway only needs plumbing prior to cover at restrooms. 8/11/2000 9:21:05 AM
|
BLD00-02162
| BLD-Foundation | 8/10/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 06:41:56. Contact: ###-####. Adding 2 bar to walls,hd's not in place. 8/11/2000 9:18:17 AM
|
BLD00-01978
| BLD-Foundation | 8/9/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/09/2000 at 07:13:22. Contact: ###-####. not ready just did footings. 8/9/2000 2:18:30 PM
|
BLD00-00597
| BLD-Final | 8/9/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/09/2000 at 10:16:17. Contact: ###-####. Temp glass,fire caulk,crawl wall,bonus room attic cover paper with flame retardant. 8/11/2000 9:22:15 AM
|
BLD00-01947
| BLD-Framing/Rough-in | 8/9/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | A | CANC |
|
|
DALE=-- ###-#### FR This needed elect plumbing etc. 8/11/2000 9:19:13 AM
|
BLD00-00039
| BLD-Framing/Rough-in | 8/9/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | P | CANC |
|
|
###-#### kent--fr
|
BLD00-02164
| BLD-Footing | 8/10/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 07:23:02. Contact: ###-####. Pored prior to inspection,Note left property line,must assume all of the massonry fence is on this parcel to comply with 5 foot set backs. No pins located no persons at site. 8/11/2000 9:25:44 AM
|
MEC00-02685
| Final | 8/10/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 07:47:59. Contact: ###-####. C/N posted. 8/11/2000 9:28:10 AM
|
BLD00-01666
| BLD-Other | 8/10/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 08:10:39. Contact: ###-####. Nail up hd's at rear. 8/11/2000 9:23:59 AM
|
BLD00-02021
| BLD-Foundation | 8/10/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | P | CANC |
|
|
Wrong inspection called by different contractor. 8/11/2000 9:27:37 AM
|
MEC00-02532
| Rough-in | 8/10/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 09:48:15. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 08/10/2000 at 10:47:59.
|
BLD00-01802
| BLD-Framing/Rough-in | 8/10/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/10/2000 at 10:14:28. Contact: ###-####. 1 hour corridor not required. 8/11/2000 9:22:41 AM
|
BLD99-02201
| BLD-Framing/Rough-in | 8/10/2000 | 8/10/2000 | 8/10/2000 12:00:00 AM | P | FAIL |
|
|
shear wall Don ###-#### Approved plans not on site,prior c/n not at site.new c/n. 8/11/2000 9:23:32 AM
|