Inspections for the day of: Friday, August 10, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-01391 MEC-Aging Inspection8/10/20018/10/20018/10/2001 12:00:00 AM PASS
MEC01-01359 MEC-Aging Inspection8/10/20018/10/20018/10/2001 12:00:00 AM PASS
MEC01-00867 MEC-Aging Inspection8/10/20018/10/20018/10/2001 12:00:00 AM PASS
MEC01-02281 Final8/2/20018/10/20018/10/2001 12:00:00 AMAPASS
###-####
MEC01-02375 Rough-in8/9/20018/10/20018/10/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/09/2001 at 12:14:40. Contact: .
MEC01-02098 Rough-in8/9/20018/10/20018/10/2001 12:00:00 AMAPASS
###-####
MEC01-01138 Pressure Test8/9/20018/10/20018/10/2001 12:00:00 AMAPASS
re p/t moved gas line sam ###-####
MEC01-00793 Final8/9/20018/10/20018/10/2001 12:00:00 AMAPASS
8:30 to 10:30 is the only time customer can be there-tim -###-#### call 1st before insp
MEC01-02372 Final8/9/20018/10/20018/10/2001 12:00:00 AMACANC
fn - brian ###-####
MEC01-01849 Pressure Test8/9/20018/10/20018/10/2001 12:00:00 AMAPASS
pres test - mike white ###-####
MEC01-01030 Final8/9/20018/10/20018/10/2001 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 08/09/2001 at 12:48:59. Contact: ###-####.
MEC01-01890 Rough-in8/9/20018/10/20018/10/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/09/2001 at 14:15:41. Contact: ###-####.... 8/10/2001 9:59:20 AM.. 8/10/2001 12:02:52 PM....###-#### 8/10/2001 12:04:18 PM..rob 8/10/2001 12:05:18 PM u/g spiral pipe..marked on the plans 8/10/2001 3:37:13 PM
MEC01-02377 Final8/10/20018/10/20018/10/2001 12:00:00 AMPNR
DICK ###-#### F/P ONLY
MEC01-02208 Final8/10/20018/10/20018/10/2001 12:00:00 AMPFAIL
THIS SHOWS A PARTIAL WAS DONE BY ALAN, ###-#### called amy at adv and told her 8/10/2001 4:41:23 PM
MEC01-02387 Final8/10/20018/10/20018/10/2001 12:00:00 AMPNR
dennis ###-####