MEC01-01402
| MEC-Aging Inspection | 8/10/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | | PASS |
|
|
wip, exp. 11/7/01 8/10/2001 8:47:15 AM
|
BLD01-02142
| BLD-Footing | 8/9/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | A | PART |
|
|
###-####
wip, verbal corrections 8/10/2001 10:45:07 AM
|
BLD01-00225
| BLD-Final | 8/8/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | A | PART |
|
|
call first ###-####
temp. occ. ok pending other trades, then perm. occ. ok pending trades 8/10/2001 10:21:53 AM
|
BLD01-02061
| BLD-Footing | 8/9/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | A | PART |
|
|
todd- ###-#### ft
already poured 8/10/2001 12:03:31 PM
|
BLD98-02617
| BLD-Framing/Rough-in | 8/9/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | A | PART |
|
|
Andrew ###-####
ok w/ verbal corrections, no electrical at this time, Andy said he will get an electrical permit at later date if, or when he puts in power. 8/10/2001 11:35:14 AM
|
BLD00-02070
| BLD-Other | 8/9/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | A | PASS |
|
|
Driveway has been completed as per the owner, please verify & call Cathy so bond can be returned. Thanks
|
BLD00-01492
| BLD-Foundation | 8/9/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | A | PART |
|
|
###-#### chris
wip, verbal corrections 8/10/2001 11:08:36 AM
|
BLD00-01498
| BLD-Foundation | 8/9/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | A | PART |
|
|
###-#### chris
wip, ok so far 8/10/2001 11:08:01 AM
|
BLD00-01844
| BLD-Final | 8/9/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | P | PASS |
|
|
fn insp phil ###-####
|
BLD01-00188
| BLD-Energy code compliance | 8/9/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 07:55:04. Contact: 85088030.
|
BLD00-03627
| BLD-Energy code compliance | 8/9/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/09/2001 at 07:56:11. Contact: 85088030.
not all the way done w/ framing corrections but ok to start rocking unaffected areas. 8/10/2001 4:11:55 PM
|
BLD01-00188
| BLD-Final | 8/9/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | P | NR |
|
|
8/9/2001 6:24:02 PM
|
BLD01-00534
| BLD-Framing/Rough-in | 8/10/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/10/2001 at 08:21:42. Contact: ###-####.
not ready, hold downs not in yet 8/10/2001 2:05:23 PM
|
BLD01-02162
| BLD-Conference | 8/10/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | P | PASS |
|
|
HY-- FOR CONF-- ###-####
framing and future remodel 8/10/2001 4:08:03 PM
|
BLD99-01551
| BLD-Final | 8/10/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | P | PASS |
|
|
FN -MARK ###-####-- CELL --CALL 1ST BEFORE
|
MEC01-02320
| Final | 8/10/2001 | 8/10/2001 | 8/10/2001 12:00:00 AM | P | PASS |
|
|
needs sticker that final is ok to homeowner ###-#### billie
|