Inspections for the day of: Wednesday, August 10, 2005.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00257 INSP-Final Inspection8/10/20058/10/20058/11/2005 3:28:55 PMPPASS
Permit finaled
MIS05-00116 FIR-Final8/10/20058/10/20058/10/2005 3:58:42 PMPPASS
Life safety finaled
FIR04-00664 INSP-Sprinkler Rough-in/Hydro8/10/20058/10/20058/10/2005 3:06:25 PMPPART
Hydro test for the wet system and anti-freeze loop passed. Contractor needs to provide test papers.
FIR04-00737 INSP-Sprinkler Rough-in/Hydro8/10/20058/10/20058/10/2005 2:17:58 PMPFAIL
Wet system hydro test failed again.
FIR05-00432 INSP-Final Inspection8/10/20058/10/20058/10/2005 2:05:45 PMPFAIL
eric ; Phone #: ###-####
Aririved at job site. Called contractor and he stated that the work had not been done yet. No inspection performed.
FIR05-00373 INSP-Final Inspection8/9/20058/10/20058/10/2005 12:47:58 PMAFAIL
Plans do not match floor layout. Resubmittals required. Per Bill Alexander coverage not required above the soffit as discussed.
BLD05-01202 FIRE-Final Inspection8/9/20058/10/20058/10/2005 9:24:49 AMACANC
FIR04-00737 INSP-Sprinkler Rough-in8/9/20058/10/20058/10/2005 9:10:25 AMAFAIL
Dave found leak in system. Test rescheduled for this afternoon.
BLD04-02272 FIRE-Final Inspection8/9/20058/10/20058/10/2005 8:17:22 AMAPASS
life safety finaled
FIR05-00197 INSP-Final Inspection8/9/20058/10/20058/10/2005 7:30:27 AMAPASS
Scheduled by a contractor via Hello! on 8/9/2005 at 12:20:43 PM. Contact: ###-####.
BLD05-00450 FIRE-Final Inspection8/9/20058/10/20058/9/2005 12:19:59 PMAPASS
Fire life safety finaled
BLD05-00368 FIRE-Final Inspection8/9/20058/10/20058/9/2005 12:18:50 PMAPASS
Fire life safety finaled