Inspections for the day of: Friday, August 10, 2007.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-02204 FIRE-Final Inspection8/10/20078/10/20078/13/2007 9:15:16 AMPPASS
Fire life safety finaled.
FIR07-00482 INSP-Sprinkler Rough-in/Hydro8/7/20078/10/20078/10/2007 4:15:16 PMPDEFR
Rescheduled per discussion with contractor.
FIR07-00460 INSP-Final Inspection8/8/20078/10/20078/10/2007 3:45:00 PMAFAIL
Items # 1,2,and 6 on the previously issued correction notice remain to be fully addressed.
FIR07-00267 INSP-Final Inspection8/10/20078/10/20078/10/2007 2:30:13 PMPPASS
Corrections made, fire alarm permit finaled.
FIR07-00474 INSP-Sprinkler Rough-in/Hydro8/9/20078/10/20078/10/2007 2:12:08 PMPFAIL
Pneumatic testing failed due to 3 1/2 psi pressure loss at the guage.
FIR07-00482 INSP-Final Inspection8/7/20078/10/20078/10/2007 1:50:55 PMPNR
Need to test sprinkler monitoring and alarm via project related FA permit prior to final approval.
FIR07-00493 INSP-Final Inspection8/10/20078/10/20078/10/2007 1:40:26 PMPPASS
c/n items repaired, fire sprinkler permit finaled.
FIR07-00572 INSP-Sprinkler Rough-in8/10/20078/10/20078/10/2007 1:32:20 PMPFAIL
Inspection concluded after 1st and 2nd floors due to the excessive number of defficiencies including overspaced heads, blocked heads, missing retaining straps at beam clamps, mixed temp. heads, mixed k-factors, missing hangers, heads in need of adjustment at drop ceilngs, some heads are still covered with painters tape and paper, etc.
FIR07-00316 INSP-Sprinkler Rough-in/Hydro8/9/20078/10/20078/10/2007 12:51:05 PMAFAIL
UG fire supply line hydrostatic test failed due to 15psi. pressure loss at the guage.
FIR07-00446 INSP-Sprinkler Rough-in8/9/20078/10/20078/10/2007 12:05:40 PMACANC
Inspection rescheduled per phone call from contractor.
FIR07-00243 INSP-Sprinkler Rough-in/Hydro8/9/20078/10/20078/10/2007 12:04:34 PMAPART
Heads at the laundry chute are okay for cover, noted one hanger at the 2nd floor piping to the chute in need of attatchment.
FIR07-00592 INSP-Sprinkler Rough-in/Hydro8/10/20078/10/20078/10/2007 11:46:35 AMPPART
Items noted at previous inspection have been completed, overhead FS piping is acceptable for cover.
FIR07-00618 INSP-Sprinkler Rough-in/Hydro8/9/20078/10/20078/10/2007 11:33:17 AMAPART
OH rough-in at the drop ceilings is approved for cover. Also discussed exit signage and emergency lighting with the on site electrician.
MIS07-00151 FIR-Final8/9/20078/10/20078/10/2007 11:31:39 AMAFAIL
Need verification of a current annual inspection by a licensed fire sprinkler contractor for the existing fire sprinkler system, doors and hardware at several locations in the back office areas are missing and will need to be installed for verification of code compliance, provide means to test EM lighting at the sales floor and stock area.
FIR05-00536 INSP-Sprinkler Rough-in8/10/20078/10/20078/10/2007 11:27:23 AMAPART
OH rough-in is approved as noted for shell areas on the 6th and 7th floors see sheets FP 22,23,24,25 on stamped resubmittals, three rooms as noted on each floor no access provided, one area each floor needs to have the temp. walls removed to eliminate obstruction issues for shell system protection.