Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE12-01740 Final8/9/20128/10/20128/13/2012 9:53:56 AMAPASS
Contact Craig Timmons before heading out so he can meet you there ###-####. Phone #: ###-#### >> Inspection requested via web by Tina Payne final ok
ELE12-01988 Permanent Service8/8/20128/10/20128/10/2012 5:01:55 PMPPASS
Gary Phone #: ###-#### p/s o/h rec ok
GCE12-00122 GCE-Rough-In8/10/20128/10/20128/10/2012 4:43:06 PMPFAIL
Matt @ ###-####
AFternoon inspection requested for today. Corrections still exsist UL's White book page 305 photovltaic modules and panels (UL mark)
ELE12-01997 Final8/10/20128/10/20128/10/2012 4:01:21 PMPPASS
final ok
ELE12-01997 Electrical Rough-In8/9/20128/10/20128/10/2012 4:01:04 PMPPASS
Mike Phone #: ###-#### lighting retro canopy LED lighting UL listed rough-in ok
ELE12-02005 Electrical Rough-In8/9/20128/10/20128/10/2012 3:47:55 PMPPASS
SITE IS ON FIRST FLOOR STE 160. cONTACT IS SID ###-#### Phone #: ###-#### >> Inspection requested via web by JENNY EMEL rough-in ok cover walls and pour concrete as per marked on plans and dated 8/10/12
ELE11-02692 Electrical Rough-In8/10/20128/10/20128/10/2012 3:19:44 PMPPASS
Contact: Tony Holt - underground inspection, late morning or early afternoon if possible please Phone #: ###-#### >> Inspection requested via web by Deb Gooden rough-in ok cover underground for lighting pole fixtures along Myrtle St
ELE12-02003 Conference8/9/20128/10/20128/10/2012 2:49:04 PMAPASS
call 1/2 before//darin Phone #: ###-#### Discuss with homeowner requirements for single family remodel complete with service upgrade
ELE12-01755 Final8/9/20128/10/20128/10/2012 1:45:38 PMAPASS
Patrick is contact. Thanks! Phone #: ###-#### >> Inspection requested via web by Chris Chesnut
ELE12-01322 Final8/9/20128/10/20128/10/2012 1:44:10 PMAFAIL
Patrick is contact. Thanks Phone #: ###-#### >> Inspection requested via web by Chris Chesnut NEC 410.16 (B) Walkin closet Incandescent luminaires with open or partially enclosed lamps shall not be permitted
ELE12-02004 Electrical Rough-In8/9/20128/10/20128/10/2012 1:14:32 PMAPASS
conduit and grounding Phone #: ###-#### >> Inspection requested via web by Mike Okamura rough-in ok cover underground
ELE12-01911 Final8/10/20128/10/20128/10/2012 10:12:41 AMPPASS
final ok
ELE12-01911 Electrical Rough-In8/9/20128/10/20128/10/2012 10:11:49 AMAPASS
Phone #: ###-#### >> Inspection requested via web by PAT MILLER rough-in ok
ELE12-01983 Final8/10/20128/10/20128/10/2012 10:03:33 AMAPASS
final ok
ELE12-01983 Permanent Service8/9/20128/10/20128/10/2012 10:02:40 AMAPASS
Ready for inspection as we discussed yesterday.
Thanks,
Dan. Phone #: ###-#### >> Inspection requested via web by Dan Mitchell p/s o/h n ok
ELE11-01872 Final8/9/20128/10/20128/10/2012 9:53:01 AMAPASS
>> Inspection requested via web by Patrick Paz final ok
ELE12-01493 Electrical Rough-In8/10/20128/10/20128/10/2012 9:42:28 AMAPASS
garage is wired Phone #: ###-#### >> Inspection requested via web by Neal Rumsey rough-in ok cover detached garage
GCE12-00122 GCE-Rough-In8/9/20128/10/20128/10/2012 9:24:20 AMAFAIL
Matt @ ###-####
Call in advance Solar Photovoltaic system, NEC 110.3(B) Equipment not listed with nationally recongnized testing lab
GCE12-00060 GCE-Final8/8/20128/10/20128/10/2012 8:49:27 AMANR
Chris @ ###-####
ELE12-00409 Final8/9/20128/10/20128/10/2012 8:30:45 AMAPASS
Hooked up the trailer to the new meter on the pole and capped off the old underground feed. Call Jimmy @ ###-#### for questions. Phone #: ###-#### >> Inspection requested via web by John Edwards final ok
ELE12-01995 Electrical Rough-In8/9/20128/10/20128/9/2012 5:08:30 PMAPASS
Phone #: ###-#### >> Inspection requested via web by kevin blackmon rough-in ok cover