Inspections for the day of: Friday, August 10, 2012.
Number of inspections: 15
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00018 Site Preparation8/3/20128/3/2012   
BLD12-01765 BLD-Energy code compliance8/10/20128/10/20128/10/2012 4:01:11 PMPPASS
Steve Phone #: ###-####. Rigid foam insulation on interior side of stemwall.
BLD12-01763 BLD-Energy code compliance8/10/20128/10/20128/10/2012 4:00:16 PMPPASS
Steve Phone #: ###-####. Rigid foam insulation on interior side of stemwall.
BLD12-00679 BLD-Foundation8/10/20128/10/20128/10/2012 3:59:25 PMPPASS
Dane Phone #: ###-####
BLD12-01923 BLD-Footing8/9/20128/10/20128/10/2012 3:13:43 PMPPASS
late as possible//Curt Phone #: ###-####
BLD12-02056 BLD-Conference8/9/20128/10/20128/10/2012 1:53:13 PMPDONE
Phone #: ###-#### >> Inspection requested via web by Chris Howell. All work appeared to be done in accordance with local codes and ordinances.
BLD12-02056 DOC - Permit Finaled8/10/20128/10/20128/10/2012 1:52:26 PMPPASS
BLD12-00998 BLD-Final8/10/20128/10/20128/10/2012 1:36:10 PMPPASS
kevin Phone #: ###-####
BLD12-00998 DOC - Permit Finaled8/10/20128/10/20128/10/2012 1:36:02 PMPPASS
BLD12-01934 BLD-Final8/10/20128/10/20128/10/2012 10:32:19 AMAFAIL
MH final Phone #: ###-#### >> Inspection requested via web by Richard Estes. Needs mech. final and provide landing at botttom of stairs.
BLD12-01933 BLD-Final8/10/20128/10/20128/10/2012 10:31:38 AMAFAIL
MH final Phone #: ###-#### >> Inspection requested via web by Richard Estes. Provide landing at bottom of stairs.
BLD12-01931 BLD-Final8/10/20128/10/20128/10/2012 10:31:08 AMAFAIL
MH final Phone #: ###-#### >> Inspection requested via web by Richard Estes. Neesd mech final and needs to provide landing at bottom of stairs.
BLD12-00684 BLD-Conference8/9/20128/10/20128/10/2012 10:08:50 AMADONE
Meeting with subcotractors. Met with subcontractors on site to discuss all rated penetrations and what will be required.
ESC12-00597 Random Inspection8/10/20128/10/20128/10/2012 10:07:02 AMAPASS
BLD12-01556 BLD-Wall Bracing8/9/20128/10/20128/10/2012 10:06:43 AMAPASS
zach Phone #: ###-####. Exterior wall bracing ok.