Inspections for the day of: Monday, August 10, 2015.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorThomas Walsh
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-00681 FIRE-Final Inspection8/10/20158/10/20158/10/2015 2:52:49 PMPDONE
Reinspection to confirm two (2) added no parking signs for fire access road. Also completed inspection of fire sprinkler punchlist items. ROCs docs to be completed when ready.
FIR14-00815 INSP-Final Inspection8/10/20158/10/20158/10/2015 2:33:27 PMPPART
Reinspection of punchlist items for fire sprinkler systems final sign-off. All previous discrepancies adequately addressed. Contractor will schedule ROC docs sign off.
Otherwise all systems are signed off.
FIR14-00687 INSP-Sprinkler Rough-in8/10/20158/10/20158/10/2015 2:06:42 PMPPART
RTC inspection for the dry ppe fire sprinkler system protecting the east-side of the parking garage. Except for two (2) heads that need to be added - one on the east entry rollup gate and the other at the south-west corner of the system, it is OK to cover the pipe for this system.
Will reinspect to ensure that these 2 sprinklers get installed prior to hydrotest.
FIR14-00365 INSP-Final Inspection8/10/20158/10/20158/10/2015 12:17:10 PMPPART
Reinspection of fire sprinkler systems for Helix and above ground FP systems, including inspection of punchlist items from last inspection. All punchlist items adeqautely addressed.
Main WF electric bell to be installed outside of main FACP control room.
Also tested main PIVs (9th and 11th streets). Both were not working correctly and will be retested after repaired/replaced.
FIR14-00792 INSP-Sprinkler Rough-in8/7/20158/10/20158/10/2015 12:13:40 PMAPART
Re-inspection of fire caulking of 3rd floor Bldg. H - RTC inspection. All penetrations adequately fire caulked. OK to cover pipe in this area - see plans for areas (rooms) inspected.