BLD16-02811
| BLD-Final | 8/10/2016 | 8/10/2016 | 8/11/2016 10:44:03 AM | P | PASS |
|
|
Inspection requested via web by Ira Rutledge
|
BLD16-01888
| BLD-Framing/Rough-in | 8/10/2016 | 8/10/2016 | 8/11/2016 10:41:38 AM | P | DEFR |
|
|
Curtis Phone #: ###-#### out of time
|
BLD15-00516
| BLD-Final | 8/9/2016 | 8/10/2016 | 8/10/2016 4:54:44 PM | A | NR |
|
|
Bob Phone #: ###-####
|
BLD16-02164
| BLD-Footing | 8/10/2016 | 8/10/2016 | 8/10/2016 4:23:23 PM | P | PASS |
|
|
Footing inspection can be done at anytime. Footings are already dug and accessible at anytime for inspection. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD16-02658
| BLD-Final | 8/9/2016 | 8/10/2016 | 8/10/2016 4:02:05 PM | A | PASS |
|
|
Phone #: 8694676 >> Inspection requested via mobile web by Barry Spencer
|
BLD16-02658
| DOC - Permit Finaled | 8/10/2016 | 8/10/2016 | 8/10/2016 4:01:54 PM | P | PASS |
|
|
|
BLD16-02688
| BLD-Footing | 8/10/2016 | 8/10/2016 | 8/10/2016 4:01:27 PM | P | PASS |
|
|
Shawn Phone #: ###-####
|
BLD16-02215
| BLD-Wall Bracing | 8/10/2016 | 8/10/2016 | 8/10/2016 3:50:48 PM | P | PASS |
|
|
Zane Phone #: ###-####
|
BLD14-01827
| BLD-Other | 8/10/2016 | 8/10/2016 | 8/10/2016 3:32:03 PM | P | PASS |
|
|
Second floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD16-00874
| BLD-Final | 8/10/2016 | 8/10/2016 | 8/10/2016 3:31:35 PM | P | PASS |
|
|
Jeff Phone #: ###-####-please call for accesss code
|
BLD16-00874
| DOC - Permit Finaled | 8/10/2016 | 8/10/2016 | 8/10/2016 3:31:20 PM | P | PASS |
|
|
|
BLD15-01997
| BLD-Concrete | 8/10/2016 | 8/10/2016 | 8/10/2016 2:48:56 PM | P | PASS |
|
|
|
BLD16-00307
| BLD-Conference | 8/9/2016 | 8/10/2016 | 8/10/2016 2:47:29 PM | P | PART |
|
|
Mesh/Rebar inspection for Slab on Deck at Elevation 20, between Grids 17.8 to 28.5 and U.8 to S. Please call Dan Koski with any concerns ###-#### Phone #: ###-#### Inspection requested via web by Dan Koski si to verify 2/3 bearing and no bolt weld length west wall
|
BLD16-00882
| BLD-Framing/Rough-in | 8/9/2016 | 8/10/2016 | 8/10/2016 10:03:48 AM | A | PASS |
|
|
Jon// please call before Phone #: ###-####
|
BLD12-01802
| BLD-Conference | 8/9/2016 | 8/10/2016 | 8/10/2016 9:37:25 AM | A | PASS |
|
|
Kaj Phone #: ###-####
|
BLD16-02013
| BLD-Footing | 8/9/2016 | 8/10/2016 | 8/10/2016 9:08:01 AM | A | PASS |
|
|
Chris Phone #: ###-####
|
BLD15-04239
| BLD-Conference | 8/9/2016 | 8/10/2016 | 8/10/2016 8:41:58 AM | A | PASS |
|
|
I've tried to contact someone on this to have them either extend the temp c of o or call in inspections to final. No one calls me back. Can you check to see if they are ready to have the building final?wip
|
BLD14-01653
| BLD-Aging Inspection | 8/10/2016 | 8/10/2016 | 8/10/2016 8:40:58 AM | | FAIL |
|
|
need rated windows/
|