FIR17-00365
| INSP-Final Inspection | 8/10/2017 | 8/10/2017 | 8/10/2017 2:48:33 PM | P | FAIL |
|
|
Project is not ready for a final yet. Will need hydro tests and flushing. Todays inspection was for the remaining remote FDC piping/vault. Piping can be covered up to the FDC. The FDC need the wrapping as per Chapter 10 of NFPA 13 prior to cover.
|
BLD16-03327
| FIRE-Final Inspection | 8/9/2017 | 8/10/2017 | 8/10/2017 1:47:24 PM | A | PASS |
|
|
Life safety passed. Contractor to provide single action hardware on doors with locks prior to a building inspection.
|
BLD17-02613
| FIRE-Final Inspection | 8/9/2017 | 8/10/2017 | 8/10/2017 10:24:56 AM | A | PASS |
|
|
Life safety passed
|
NAF17-00049
| INSP-Final | 8/9/2017 | 8/10/2017 | 8/10/2017 9:58:51 AM | A | DONE |
|
|
Call for access Phone #: 8534247 >> Inspection requested via mobile web by Tara monahan
|
FIR17-00345
| INSP-Final Inspection | 8/9/2017 | 8/10/2017 | 8/10/2017 9:47:32 AM | P | PASS |
|
|
permit finaled
|
BLD17-01322
| FIRE-Final Inspection | 8/9/2017 | 8/10/2017 | 8/10/2017 9:47:12 AM | A | PASS |
|
|
life safety passed
|