Inspections for the day of: Tuesday, August 11, 1998.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD97-02259 INSP - Framing/Rough-in8/11/19988/11/19988/11/1998 12:00:00 AMANR
conf w/ Steve of Olsen Arch's re c/n of 8-10...need detail for penetrations; equivalent alternate const at 2hr wall ok so as to give contractor option.
BLD98-01267 INSP - Framing/Rough-in8/11/19988/11/19988/11/1998 12:00:00 AMPFAIL
buster ###-####...c/n, fireblocks, post/beam connections, htg c/n. ok to insul.
BLD98-01451 INSP - Final8/11/19988/11/19988/11/1998 12:00:00 AMPFAIL
Kevin Adams, ###-#### - Final - call 1st called, went by; c/n: ramp, seal ext/int penetrations, htg c/n, etc. Gave c/n to owner.
BLD98-01850 INSP - Energy code compliance8/11/19988/11/19988/11/1998 12:00:00 AMPNR
conf w/ bldr. re insul at wet wall. conf only...Stan & Lee have been consulted.
MEC98-02325 INSP - Framing/ Rough-in8/11/19988/11/19988/11/1998 12:00:00 AMPNR
still need flue listing & instruction
MEC98-02425 INSP - Final8/10/19988/11/19988/11/1998 12:00:00 AMPFAIL
BECKI ###-####...per ba...need verify r/i, gage defective for gas test, seal boots/registers.
MEC98-02425 INSP - Final8/10/19988/11/19988/11/1998 12:00:00 AMPFAIL
BECKI ###-####...per ba...need verify r/i, gage defective for gas test, seal boots/registers.
MEC98-02446 INSP - Framing/ Rough-in8/11/19988/11/19988/11/1998 12:00:00 AMPPASS
Scheduled by Hello!. Contact phone is [3434446]. c/n ok for r/i.
BLD96-02800 INSP - Final8/11/19988/11/19988/11/1998 12:00:00 AMPFAIL
need fire ok, complete install roll-up doors & actuators, hand rails,etc.
BLD96-03235 INSP - Final8/11/19988/11/19988/11/1998 12:00:00 AMPNR
rec'd eng's letter re spec. insp reports...ok. 342 area.