BLD97-02259
| INSP - Framing/Rough-in | 8/11/1998 | 8/11/1998 | 8/11/1998 12:00:00 AM | A | NR |
|
|
conf w/ Steve of Olsen Arch's re c/n of 8-10...need detail for penetrations; equivalent alternate const at 2hr wall ok so as to give contractor option.
|
BLD98-01267
| INSP - Framing/Rough-in | 8/11/1998 | 8/11/1998 | 8/11/1998 12:00:00 AM | P | FAIL |
|
|
buster ###-####...c/n, fireblocks, post/beam connections, htg c/n. ok to insul.
|
BLD98-01451
| INSP - Final | 8/11/1998 | 8/11/1998 | 8/11/1998 12:00:00 AM | P | FAIL |
|
|
Kevin Adams, ###-#### - Final - call 1st called, went by; c/n: ramp, seal ext/int penetrations, htg c/n, etc. Gave c/n to owner.
|
BLD98-01850
| INSP - Energy code compliance | 8/11/1998 | 8/11/1998 | 8/11/1998 12:00:00 AM | P | NR |
|
|
conf w/ bldr. re insul at wet wall. conf only...Stan & Lee have been consulted.
|
MEC98-02325
| INSP - Framing/ Rough-in | 8/11/1998 | 8/11/1998 | 8/11/1998 12:00:00 AM | P | NR |
|
|
still need flue listing & instruction
|
MEC98-02425
| INSP - Final | 8/10/1998 | 8/11/1998 | 8/11/1998 12:00:00 AM | P | FAIL |
|
|
BECKI ###-####...per ba...need verify r/i, gage defective for gas test, seal boots/registers.
|
MEC98-02425
| INSP - Final | 8/10/1998 | 8/11/1998 | 8/11/1998 12:00:00 AM | P | FAIL |
|
|
BECKI ###-####...per ba...need verify r/i, gage defective for gas test, seal boots/registers.
|
MEC98-02446
| INSP - Framing/ Rough-in | 8/11/1998 | 8/11/1998 | 8/11/1998 12:00:00 AM | P | PASS |
|
|
Scheduled by Hello!. Contact phone is [3434446]. c/n ok for r/i.
|
BLD96-02800
| INSP - Final | 8/11/1998 | 8/11/1998 | 8/11/1998 12:00:00 AM | P | FAIL |
|
|
need fire ok, complete install roll-up doors & actuators, hand rails,etc.
|
BLD96-03235
| INSP - Final | 8/11/1998 | 8/11/1998 | 8/11/1998 12:00:00 AM | P | NR |
|
|
rec'd eng's letter re spec. insp reports...ok. 342 area.
|