Inspections for the day of: Friday, August 11, 2000.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01133 BLD-Final8/10/20008/11/20008/11/2000 12:00:00 AMACANC
arthur\\###-#### late pm because plm and fire need to sign off.
canc. by arthur, not ready, need fire sign off 8/11/2000 5:00:43 PM
BLD00-01482 BLD-Framing/Rough-in8/10/20008/11/20008/11/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/10/2000 at 09:01:10. Contact: ###-####.
BLD00-01474 BLD-Framing/Rough-in8/10/20008/11/20008/11/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/10/2000 at 09:02:17. Contact: ###-####.
BLD00-01471 BLD-Framing/Rough-in8/10/20008/11/20008/11/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/10/2000 at 09:03:20. Contact: ###-####.
BLD00-01071 BLD-Wall cover8/10/20008/11/20008/11/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/10/2000 at 10:29:12. Contact: ###-####.
interior shear walls w/ sheetrock .. OK 8/11/2000 10:32:57 AM
BLD00-01120 BLD-Conference8/11/20008/11/20008/11/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/11/2000 at 07:04:57. Contact: ###-####.
conference on roof change, will submit changes to plan review. 8/11/2000 11:04:54 AM
BLD00-00039 BLD-Framing/Rough-in8/10/20008/11/20008/11/2000 12:00:00 AMANR
Scheduled by a contractor via Hello! on 08/10/2000 at 17:06:02. Contact: ###-####.
BLD99-01098 BLD-Conference8/10/20008/11/20008/11/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/10/2000 at 17:10:58. Contact: ###-####.
pre final. 8/11/2000 12:05:35 PM
BLD98-02858 BLD-Final8/10/20008/11/20008/11/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/10/2000 at 17:21:55. Contact: .
C/N left , signoffs, seal vents/ siding 8/11/2000 4:51:00 PM
BLD97-01839 BLD-Final8/7/20008/11/20008/11/2000 12:00:00 AMPPASS
nathan ###-#### as per Dave Hattrick check approved set of plans and site. Go through very thoroughly.
Cert. of Compliance # 19731 8/11/2000 3:56:15 PM
BLD99-02651 BLD-Final8/11/20008/11/20008/11/2000 12:00:00 AMPCANC
JASON -- ###-#### FN
canceled by contractor, Jason 8/11/2000 4:55:02 PM
BLD00-02305 BLD-Foundation8/11/20008/11/20008/11/2000 12:00:00 AMPPART
BOB CELL --###-#### FOUND
allready poured w/out inspection 8/11/2000 2:35:35 PM
BLD00-02108 BLD-Footing8/11/20008/11/20008/11/2000 12:00:00 AMPPART
early start okay Jerad ###-####
poured w/out inspection 8/11/2000 2:46:46 PM
BLD99-02201 BLD-Framing/Rough-in8/11/20008/11/20008/11/2000 12:00:00 AMPCANC
SHEAR NAIL-- FR --###-####- DON--PLEASE CALL 1/2 HR BEFORE INSP
per don cancel -re-scheduled. canceled by 325

BLD00-02208 BLD-Footing8/10/20008/11/20008/11/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/10/2000 at 12:18:56. Contact: .
BLD00-02351 BLD-Footing8/10/20008/11/20008/11/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/10/2000 at 16:27:28. Contact: ###-####.
ok w/ verbal corrections 8/11/2000 12:45:07 PM