MIS04-00216
| BLD-Conference | 8/11/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | | DONE |
|
|
Troy.....this is the complaint......Deck is unsafe- deck was not installed by builder correctly. Is this a code violation or problem between builder & buyer???" The upper deck meets minimum code requirements. 8/11/2004 2:32:40 PM
|
MEC03-01490
| Mec-Request for Extension | 8/11/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | | DONE |
|
|
###-####
ok to extend permit 8/11/2004 1:03:07 PM
|
BLD04-01572
| BLD-Footing | 8/10/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | A | PART |
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Left c/n and talked to contractor. Ok to place concrete after completing c/n. 8/10/2004 1:42:27 PM
|
MEC04-02018
| Final | 8/10/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | A | CANC |
|
|
bj; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles out of time, rescheduled for afternoon. 8/11/2004 10:06:31 AM
|
BLD04-01372
| BLD-Framing/Rough-in | 8/10/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | A | PASS |
|
|
Tim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes call for access to number above 8/10/2004 1:40:31 PM
|
BLD04-01814
| BLD-Footing | 8/10/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | A | PASS |
|
|
ALLEN; Phone #: ###-#### Internet Inspection Request from: Annette Moore for front porch only 8/11/2004 9:56:07 AM
|
BLD04-00544
| BLD-Framing/Rough-in | 8/11/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | P | FAIL |
|
|
cole sheer nail please call 30 min before leaving for job site; Phone #: ###-#### Internet Inspection Request from: Annette Moore
Need to comply with the revised shear schedule for staples per architect. Remove all building paper from house. 8/11/2004 2:03:40 PM
|
BLD04-01627
| BLD-Footing | 8/11/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/11/2004 at 8:30:06 AM. Contact: ###-####. wip 8/11/2004 2:33:08 PM
|
MEC04-01312
| Final | 8/11/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/11/2004 at 8:30:59 AM. Contact: ###-####.
|
BLD04-01646
| BLD-Footing | 8/11/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/11/2004 at 8:31:12 AM. Contact: ###-####. wip 8/11/2004 2:33:01 PM
|
MEC04-01665
| Final | 8/11/2004 | 8/11/2004 | 8/11/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/11/2004 at 8:31:32 AM. Contact: ###-####.
|