FIR05-00428
| INSP-Sprinkler Rough-in | 8/11/2005 | 8/11/2005 | 8/12/2005 8:48:11 AM | P | PART |
|
|
Sprinkler rough-in as shown on the city plans is ok. Pendant head at north entry into large room needs to match existing. Earth quake bracing is lacking in the north end. Per the approved plans, Design Hazard/Limitiations, this permit shall meet the minimum requirements of the International FIre Code. The entire sprinkler system shall meet the code requirements under which it was installed and if it doesn't it must be brought up to current code. This is for all aspects of the sprinkler system including but not limited to hangers, EQ bracing and sprinkler spacing.
|
FIR05-00380
| INSP-Final Inspection | 8/11/2005 | 8/11/2005 | 8/12/2005 7:54:19 AM | P | PASS |
|
|
fire sprinkler finaled
|
BLD03-02236
| FIRE-Final Inspection | 8/11/2005 | 8/11/2005 | 8/11/2005 3:32:13 PM | P | FAIL |
|
|
repair emergency lights and provide the canopies for the sprinkler pendants. final fire alrm permit
|
FIR04-00737
| INSP-Sprinkler Rough-in/Hydro | 8/11/2005 | 8/11/2005 | 8/11/2005 3:16:01 PM | P | PASS |
|
|
Wet system hydro test passed
|
BLD05-01583
| FIRE-Final Inspection | 8/11/2005 | 8/11/2005 | 8/11/2005 3:14:57 PM | P | PART |
|
|
A temporary occupancy was given until I can investigate the requirement for audio/visual alarms.
|
BLD05-01583
| FIRE-Final Inspection | 8/11/2005 | 8/11/2005 | 8/11/2005 3:11:05 PM | P | CANC |
|
|
duplicate inspection
|
BLD04-00556
| FIRE-Final Inspection | 8/11/2005 | 8/11/2005 | 8/11/2005 1:35:44 PM | P | PASS |
|
|
Life safety finaled
|
FIR05-00443
| INSP-Sprinkler Rough-in | 8/11/2005 | 8/11/2005 | 8/11/2005 1:35:17 PM | P | FAIL |
|
|
The existing sidewall heads above the ceiling are blocked by new duct work. Additional heads and resubmittals are required. I told the contractor that I was ok with the school opening as long as this work area was not accessible.
|
FIR04-00376
| FIR-Aging Inspection | 8/11/2005 | 8/11/2005 | 8/11/2005 12:47:35 PM | | NR |
|
|
work in progress
|
FIR04-00375
| FIR-Aging Inspection | 8/11/2005 | 8/11/2005 | 8/11/2005 12:47:09 PM | | NR |
|
|
work in progress
|
FIR04-00374
| FIR-Aging Inspection | 8/11/2005 | 8/11/2005 | 8/11/2005 12:46:12 PM | | NR |
|
|
work in progress
|
FIR05-00155
| INSP-Sprinkler Rough-in/Hydro | 8/10/2005 | 8/11/2005 | 8/11/2005 12:31:44 PM | P | FAIL |
|
|
Overhead hydro test failed. System lost 4 lbs
|
FIR05-00016
| INSP-Sprinkler Rough-in/Hydro | 8/10/2005 | 8/11/2005 | 8/11/2005 12:30:15 PM | P | PASS |
|
|
Underground supply line hydro test passed
|
BLD04-01909
| FIRE-Conference | 8/11/2005 | 8/11/2005 | 8/11/2005 12:27:08 PM | P | DONE |
|
|
I marked up sheet C1.0 on the approved drawings in red for the curbing that needs to be painted to show the fire dept access routes.
|
FIR03-00737
| INSP-Final Inspection | 8/11/2005 | 8/11/2005 | 8/11/2005 11:46:10 AM | P | FAIL |
|
|
dave; Phone #: ###-#### Provide map at the facp and repair/test both phone lines since they did not provide trouble when disconnected.
|
FIR05-00432
| INSP-Final Inspection | 8/10/2005 | 8/11/2005 | 8/11/2005 11:00:25 AM | A | PASS |
|
|
Fire alarm permit finaled
|
BLD04-02934
| FIRE-Conference | 8/10/2005 | 8/11/2005 | 8/11/2005 10:59:57 AM | A | DONE |
|
|
Per sam rogers a temp would be acceptable if the existing fire alarm system provided adequate sound levels in the remodeled area. All other life safety items would need to be provided prior to the temporary occupancy being given
|
BLD04-02767
| FIRE-Conference | 8/11/2005 | 8/11/2005 | 8/11/2005 10:59:38 AM | P | DONE |
|
|
Per sam rogers a temp would be acceptable if the existing fire alarm system provided adequate sound levels in the remodeled area. All other life safety items would need to be provided prior to the temporary occupancy being given
|
FIR05-00210
| INSP-Conference | 8/11/2005 | 8/11/2005 | 8/11/2005 10:59:19 AM | P | DONE |
|
|
Per sam rogers a temp would be acceptable if the existing fire alarm system provided adequate sound levels in the remodeled area. All other life safety items would need to be provided prior to the temporary occupancy being given
|
FIR05-00363
| INSP-Alarm Testing | 8/10/2005 | 8/11/2005 | 8/11/2005 9:12:28 AM | A | PASS |
|
|
Fire alarm finaled
|
FIR05-00363
| INSP-Final Inspection | 8/11/2005 | 8/11/2005 | 8/11/2005 9:12:09 AM | P | PASS |
|
|
Fire alarm finaled
|
BLD05-01220
| FIRE-Final Inspection | 8/10/2005 | 8/11/2005 | 8/11/2005 8:36:08 AM | A | PART |
|
|
robert; Phone #: ###-#### Inspection was for the smoke evac system. It operated correctly from the two spot type smoke detectors located at the two front exit/entrance. I also inspected the exit signs and emergency lights. They passed as well. I notified the general contractor that the door to the lab with the keyed deadbolt is not approved type of hardware.
|