ELE03-03037
| Final | 8/10/2005 | 8/11/2005 | 8/11/2005 11:15:17 PM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 8/10/2005 at 9:49:17 AM. Contact: ###-####. 1. 90% of all j-boxes are not properly grounded 2. conduits are supporting conduits in two locations 3. very few of the control boxes are listed and labled 4. most pumps that have been installed are not properly listed and labled 5. no inspections have been done on the transformers. 6. no inspections have been done on panels and mcc units. 7. no inspections have been done on the cable trays under the walkways. 8. There are more violations that are present, and further inpections need to be accomplished.
|
ELE05-01737
| Final | 8/11/2005 | 8/11/2005 | 8/11/2005 5:33:57 PM | P | PASS |
|
|
donna; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
ELE05-01804
| Final | 8/11/2005 | 8/11/2005 | 8/11/2005 4:01:10 PM | P | FAIL |
|
|
spencer; Phone #: ###-#### Internet Inspection Request from: Barbara Moore 210.52 recep spacing on counter 260.12 flex shall not be used where subject to damage.
|